Veřejná zakázka Uzavřená
CONTACTOR CURRENT RATING 200 AMP :VOLTAG [CONTACTOR CURRENT RATING 200 AMP :VOLTAGE RATING:415VAC:MAIN POLE 4NO: AUXILIARY CONTACT 1NO+1NC,CONTROL VOLTAGE 168-300VAC WITH SURGE SUPPRESSOR]
- Lhůta
- 3. 11. 2026
- Zadavatel
- Ministry of Railways
Tato zakázka je uzavřená a už nepřijímá nabídky.
Podobné otevřené zakázky · Další zakázky: Indie
Zobrazit celé oznámení a dokumenty: začněte zkušební verzi zdarma
14 dní zkušební verze zdarma. Bez karty.
- Zadavatel
- Ministry of Railways
- Země
- Indie
- Lhůta
- 3. 11. 2026
- Zveřejněno
- 22. 10. 2026
Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.
Podobné otevřené zakázky
-
E5163165 RATE CONTRACT FOR SUPPLY OF HS15250 COMMUTATOR ASSEMBLY
Bharat Heavy Electricals Limited Lhůta: 3. 11. 2026
-
SITC of HVLS Fan below central dome of main building
Ali Yavar Jung National Institute For Hearing Handicapped - Mumbai Lhůta: 3. 11. 2026
-
Design, supply, erection and commissioning of mono rail for lifting arrangement of Drainage and Dewatering system
NHPC Limited Lhůta: 3. 11. 2026
-
Repairing of dam site internal road from dam control room along power channel to NH-1A towards gate no-2 including up to power intake and SFT of Uri-II Power Station, JK
NHPC Limited Lhůta: 3. 11. 2026
-
Comprehensive Maintenance for Supporting Infrastructure, Manpower charges for the operation and maintenance of supporting infrastructure of the Supercomputing system(1 Onsite Engineer, 1 Supervisor, 3 Staff for 24/7 Support)
National Institute of Technology Tiruchirappalli Lhůta: 3. 11. 2026
-
Selection of Event Management Agency for a Port function during august visit of Honble Chief Minister, Odisha on the eve of Boita Bandana Day At Wet Basin, Paradip Port On 24.11.2026
Ministry of Shipping Lhůta: 3. 11. 2026
-
Consultancy services for preparation of detailed project report (DPR) and pre-construction activities for Widening of existing single /intermediate lane to 2-lane with paved shoulder from km. 175.00 to 311.00 (Bataghat to Maletha) on NH-707A.
Ministry of Road Transport and Highways Lhůta: 3. 11. 2026
-
Consultancy services for preparation of detailed project report (DPR) and pre-construction activities for Widening of existing single /intermediate lane to 2 lane and 2 lane with paved shoulder from Km. 0.00 to 80.00 Ghat to Udiyari Bend of NH-309A.
Ministry of Road Transport and Highways Lhůta: 3. 11. 2026