Licitație publică Deschisă

Interlocking blocks on vulnerable location Between Km 249/180 to 250/080 RHS in village Talwara and Installation of Street light, high mast light and Divider and other road safety works on NH- 927A Km. 151/400 To 256/000

Termen limită
4 nov. 2026azi
Cumpărător
Ministry of Road Transport and Highways

Ministry of Road Transport and Highways (India) solicită oferte pentru această licitație. Ofertele se depun până la 4 nov. 2026.

Cumpărător
Ministry of Road Transport and Highways
Țară
India
Termen limită
4 nov. 2026azi
Sector
Construcții și inginerie civilă
Publicat
28 sept. 2026

Descrierea completă, documentele, datele de contact ale autorității contractante și linkul către portalul oficial sunt disponibile în perioada de probă gratuită.

Mai multe licitații: India · Construcții: licitații (India)

Licitații deschise similare

  1. FIXING SCREW
    Ministry of Railways Termen limită: 4 nov. 2026
  2. Replacement of Connecting Foot Over Bridge at MP-IDSA, New Delhi
    Defence Research and Development Organisation Termen limită: 4 nov. 2026
  3. Construction of drainage line around the Composite Hospital Patgaon at Ftr HQ BSF Guwahati
    DG,BSF,Mha Termen limită: 4 nov. 2026
  4. Const. of RCC drain at Km 228/400 240/500 250/100 and 221/300 Varda leftout of 2 km, Km 250/060 to 250/860 RHS and 1 km miscellaneous length for Banswara overlay section and reconstruction of 1 No. damaged slab culvert NH-927A at Km 260/700
    Ministry of Road Transport and Highways Termen limită: 4 nov. 2026
  5. Hard shoulders and interlocking tiles work including widening of structures and drains from Kupra Village to Banswara of NH-927A Km 257/00 to 261/00
    Ministry of Road Transport and Highways Termen limită: 4 nov. 2026
  6. Road safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at Barekhan Fanta and dholapani (Ch. 27/500 and 44/500), and slope stabilization from Ch. 84/0 to 85/0 on NH-56
    Ministry of Road Transport and Highways Termen limită: 4 nov. 2026
  7. STMC work on NH-56 Old NH-113, Pratapgarh-Padi Section and Construction of 2 Lane Road in Forest Area, Km 38/100-43/040, 46/500-47/080 and 51/640-54/500, NH-113 on EPC Mode, Rajasthan
    Ministry of Road Transport and Highways Termen limită: 4 nov. 2026
  8. Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to Do Nadi Pool and Do Nadi Pool to Dungarpur and Tijwad to NH-927A PKG-4 merging point at Km 168/600 to 170/600
    Ministry of Road Transport and Highways Termen limită: 4 nov. 2026