Przetarg publiczny Otwarty
Tư vấn kiểm toán hoàn thành 10 dự án đầu tư năm 2026
Po angielsku: Consulting services for completion audit of 10 investment projects in 2026
- Termin
- 5 lis 2026jutro
- Wartość
- VND 611 867 654
- Zamawiający
- Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Công NGHỆ Thông Tin Điện LỰC Thành PHỐ HỒ Chí Minh
14 dni bezpłatnego okresu próbnego. Bez karty.
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Công NGHỆ Thông Tin Điện LỰC Thành PHỐ HỒ Chí Minh (Wietnam) zaprasza do składania ofert w tym przetargu. Termin składania ofert: 5 lis 2026. Szacunkowa wartość: VND 611 867 654. Oferty składa się elektronicznie na oficjalnej platformie zamówień publicznych.
- Zamawiający
- Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Công NGHỆ Thông Tin Điện LỰC Thành PHỐ HỒ Chí Minh
- Kraj
- Wietnam
- Termin
- 5 lis 2026jutro
- Wartość
- VND 611 867 654
- Branża
- Usługi profesjonalne i inżynieryjne
- Opublikowano
- 13 paź 2026
Pełny opis, dokumenty, kontakty zamawiającego i link do oficjalnego portalu są dostępne w bezpłatnym okresie próbnym.
Więcej przetargów w Wietnamie · Przetargi inżynieryjne w Wietnamie
Podobne otwarte przetargi
-
Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Termin: 4 lis 2026
-
Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
Ban QLDA Đầu tư Xây dựng xã Thanh An Termin: 4 lis 2026
-
TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Termin: 4 lis 2026
-
Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Termin: 4 lis 2026
-
Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Termin: 4 lis 2026
-
Consulting services for Construction Supervision of the construction project, phase 4 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Termin: 4 lis 2026
-
Installation of monitoring for 1-phase capacitive voltage transformer for bays 273, 274 of Nhon Trach 220kV substation
Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Termin: 5 lis 2026
-
Consulting services for valuation of liquidation of 125MVA transformer at Bac Lieu substation
Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Termin: 5 lis 2026