Licitação pública Aberta

Expression of Interest for lifting of pond ash on Nominal cost basis for eco friendly uses

Prazo
4 de nov. de 2026hoje
Comprador
Heavy Water Board

Heavy Water Board (Índia) convida à apresentação de propostas para esta licitação. As propostas devem ser entregues até 4 de nov. de 2026.

Comprador
Heavy Water Board
País
Índia
Prazo
4 de nov. de 2026hoje
Publicado
5 de out. de 2026

A descrição completa, os documentos, os contatos do comprador e o link para o portal oficial ficam disponíveis no teste grátis.

Mais licitações na Índia

Licitações abertas semelhantes

  1. Replacement of pipeline along with header of drainage pump of Penstock plug end tunnel as per scope of work and technical specifications of CPS-1 Power House.
    NHPC Limited Prazo: 4 de nov. de 2026
  2. Balance work of Rehabilitation and Upgradation of The Bhokardan Hasnabad Jawakheda section from km 0.630 to 950, km 4.797.5 to 456, km 5.586.6 to 100, km 6.452.920 of NH753M, km 20.765 to 957, Jawakheda to Rajur section from km 22.700 to 985, km 23.
    Ministry of Road Transport and Highways Prazo: 4 de nov. de 2026
  3. ICAT/CPPP/PSL/ARC of Transport Services/2026-27/186
    International Centre For Automotive Technology Prazo: 4 de nov. de 2026
  4. GTE for SITC of Multimode Microplate Reader for Department of Biochemistry Under ICMR Funded Project at AIIMS
    All India Institute of Medical Sciences-Bhopal Prazo: 4 de nov. de 2026
  5. SUPPLY, INSTALLATION AND COMMISSIONING OF Automatic wire Processing Machine, Cable Spool Unwinding Machine, Semi-Automatic soldering Machine, Cable Stripping Machine and Fume Extractor Machine
    Bharat Heavy Electricals Limited Prazo: 4 de nov. de 2026
  6. For Extension of 6.6KV O/H line at Kankanee OCP and installation of electrical equipment for pumping operation at Kankanee Colliery
    Bharat Coking Coal Limited Prazo: 4 de nov. de 2026
  7. Rewinding of AC ceiling fans, Exhaust fans and Industrial fans of different Service buildings inside the mines of Dudhichua Project.
    Northern Coalfields Limited Prazo: 4 de nov. de 2026
  8. Calibration, Testing and Setting Verification of Protective Relays Installed in HT and LT Panels of Substation F, Substation H, East Substation and Workshop Installed in HT and LT Panels of Substation F, Substation H, East Substation and Workshop
    Northern Coalfields Limited Prazo: 4 de nov. de 2026