Licitação pública Aberta

Travaux d’aménagement et d’entretien de 118,677 km de pistes rurales dans les départements du Zou, Couffo, Collines, Donga et Alibori repartis en trois (03) lots

Em inglês: Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots

Comprador
Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT)
País
Benin
Prazo
5 de nov. de 2026dentro de 6 dias
Setor
Construção e engenharia civil
Publicado
14 de set. de 2026

A descrição completa, os documentos, os contatos do comprador e o link para o portal oficial ficam disponíveis no teste grátis.

Mais licitações: Benin

Licitações abertas semelhantes

  1. Construction works of three (03) modules of three (03) classrooms without equipment for the benefit of EPP Somè, Zèko quartier B and Kpozoun Lokoli; and construction and equipping of modules of three (03) classrooms + office and store for the benefit of EPP Za-Zounmè and Houanvèli-Tankpa (Za-Tanta)., Construction works of two (02) modules of latrines with four (04) cabins for the benefit of EM de Davègo and the school group of EPP Agongbo A, B and EM
    Commune de Za-Kpota Prazo: 3 de nov. de 2026
  2. Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
    Commune de Dogbo Prazo: 4 de nov. de 2026
  3. Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
    Commune d'Agbangninzou Prazo: 5 de nov. de 2026
  4. Construction works of a palm oil storage center in Adja-Ouèrè.
    Agence Territoriale de Développement Agricole Pôle 6 Prazo: 6 de nov. de 2026
  5. Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
    Commune de Sô Ava Prazo: 6 de nov. de 2026
  6. Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
    Commune de Pèrèrè Prazo: 9 de nov. de 2026
  7. Construction of school infrastructure (Recovery) (prioritization of local materials)
    Commune de Grand Popo Prazo: 9 de nov. de 2026
  8. Partial construction of the fence of the Sakabansi health center (lot 1); Acquisition of medical equipment for the Nikki health center and the Sounon séro hospital (lot 2).
    Commune de Nikki Prazo: 9 de nov. de 2026