सरकारी टेंडर खुला
Khảo sát, đánh giá và lập hồ sơ thiết kế xử lý vết rạn nứt dọc mặt đập chính - Công trình thủy điện Srêpốk 3
अंग्रेज़ी में: Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
- अंतिम तिथि
- 4 नव॰ 2026आज
- मूल्य
- VND 1,264,580,029
- खरीदार
- Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN
14 दिन का मुफ़्त ट्रायल। कार्ड की ज़रूरत नहीं।
Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN (वियतनाम) इस निविदा के लिए बोलियाँ आमंत्रित कर रहा है। बोलियाँ जमा करने की अंतिम तिथि: 4 नव॰ 2026। अनुमानित मूल्य: VND 1,264,580,029। बोलियाँ आधिकारिक खरीद पोर्टल पर ऑनलाइन जमा की जाती हैं।
- खरीदार
- Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN
- देश
- वियतनाम
- अंतिम तिथि
- 4 नव॰ 2026आज
- मूल्य
- VND 1,264,580,029
- क्षेत्र
- पेशेवर और इंजीनियरिंग सेवाएँ
- प्रकाशित
- 15 अक्टू॰ 2026
पूरा विवरण, दस्तावेज़, खरीदार के संपर्क और आधिकारिक पोर्टल का लिंक मुफ़्त ट्रायल में खुलते हैं।
और टेंडर: वियतनाम · वियतनाम में इंजीनियरिंग टेंडर
मिलते जुलते खुले टेंडर
-
Global Programme Newsletter, Productivity Ecosystems for Decent Work
ILO अंतिम तिथि: 4 नव॰ 2026
-
Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP अंतिम तिथि: 4 नव॰ 2026
-
Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
Ban QLDA Đầu tư Xây dựng xã Thanh An अंतिम तिथि: 4 नव॰ 2026
-
TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam अंतिम तिथि: 4 नव॰ 2026
-
Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh अंतिम तिथि: 4 नव॰ 2026
-
Consulting services for Construction Supervision of the construction project, phase 4 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC अंतिम तिथि: 4 नव॰ 2026
-
Installation of monitoring for 1-phase capacitive voltage transformer for bays 273, 274 of Nhon Trach 220kV substation
Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia अंतिम तिथि: 5 नव॰ 2026
-
Consulting services for valuation of liquidation of 125MVA transformer at Bac Lieu substation
Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia अंतिम तिथि: 5 नव॰ 2026