Veřejná zakázka Otevřená
Sélection d’un cabinet pour (I) l’élaboration de (EIES), (II) DU (PAR) ET DU (PRMS) du projet de réhabilitation de la décharge de THIES, de construction et d’exploitation des CIVD DE NOTTO DIOBASS ET DE SANDIARA ET DU CTT MALICOUNDA
Anglicky: Selection of a firm for (I) the preparation of (ESIA), (II) of the (PAR) AND OF THE (PRMS) of the THIES landfill rehabilitation project, construction and operation of the NOTTO DIOBASS AND SANDIARA CIVD AND THE MALICOUNDA CTT.
- Lhůta
- 5. 11. 2026dnes
- Zadavatel
- Unité de coordination de la Gestion des déchets solides (UCG)
14 dní zkušební verze zdarma. Bez karty.
Unité de coordination de la Gestion des déchets solides (UCG) (Senegal) vyhlašuje tuto zakázku a přijímá nabídky. Nabídky je třeba podat do 5. 11. 2026.
- Zadavatel
- Unité de coordination de la Gestion des déchets solides (UCG)
- Země
- Senegal
- Lhůta
- 5. 11. 2026dnes
- Obor
- Stavebnictví a inženýrské stavby
- Zveřejněno
- 15. 10. 2026
Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.
Další zakázky: Senegal · Stavebnictví: veřejné zakázky (Senegal)
Podobné otevřené zakázky
-
Huaiyuan County 2026 Rural Drinking Water Project Maintenance and Repair Funds Equipment Procurement and Installation Surplus Funds Project (Second Time) Competitive Negotiation Announcement
怀远县水利局 Lhůta: 5. 11. 2026
-
Competitive Negotiation Announcement by Zhejiang Tianjian Engineering Cost Consulting Co., Ltd. on the Majin Town Yanghe Village Chinese Herbal Medicine Planting Base Project -- Equipment Procurement (Non-Government Procurement)
开化县马金镇杨和村集体经济组织 Lhůta: 5. 11. 2026
-
(DVN-VT-3774/26-XL-TTH-TRUYENHTB.TM) Equipment and tools for construction
Liên doanh Việt-Nga Vietsovpetro Lhůta: 5. 11. 2026
-
Package No. 05: Embankment reinforcement of the left bank of Long Khe An Tho canal from K0+000 to K0+100 and the right bank of Long Khe Cau Xe canal from K0+000 to K0+100, Lac Phuong commune, Hai Phong City
Công Ty Trách Nhiệm Hữu HẠN MỘT Thành Viên Khai Thác Công Trình Thuỷ Lợi BẮC HƯNG Hải Lhůta: 5. 11. 2026
-
Package No. 05: Embankment reinforcement of the left bank of Cuu An canal from K24+940 to K25+075 and from K25+335 to K25+385, Hai Hung commune, Hai Phong City
Công Ty Trách Nhiệm Hữu HẠN MỘT Thành Viên Khai Thác Công Trình Thuỷ Lợi BẮC HƯNG Hải Lhůta: 5. 11. 2026
-
Consulting supervision of construction and equipment installation for the projects: Improving operational capacity and reducing power loss of the power grid of the Nghia Hung area power grid management team, 22kV feeder of Transformer T1, 110kV Phuc Son substation, Ninh Binh province
Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Lhůta: 5. 11. 2026
-
Construction of infrastructure of stations serving network development in 2026
Mobifone Thành PHỐ HỒ Chí Minh - Chi Nhánh TỔNG Công Ty Viễn Thông Mobifone Lhůta: 5. 11. 2026
-
Supply of materials and installation services for an additional screen washing spray tier and installation of 01 additional screen washing pump to improve the efficiency of the rotary trash screen washing of the trash rack system of the main cooling water pump station of VA1 Thermal Power Plant in 2026
Chi Nhánh TỔNG Công Ty Điện LỰC Dầu Khí Việt Nam - Công Ty CỔ PHẦN - Công Ty Điện LỰC Dầu Khí Hà TĨNH Lhůta: 5. 11. 2026