Öffentliche Ausschreibung Offen

EXTENDED: Provide Coating and Lining for Kriel Condensers, Coolers, associated large bore pipework, water boxes and tube sheets for a period of 5 years on an as and when required

Vollständige Bekanntmachung und Unterlagen ansehen: kostenlos testen

14 Tage kostenlos testen. Keine Karte nötig.

Auftraggeber
Eskom
Land
Südafrika
Frist
17.11.2026in 18 Tagen
Branche
Facility-Management
Veröffentlicht
02.10.2026

Die vollständige Beschreibung, die Unterlagen, die Kontakte des Auftraggebers und der Link zum offiziellen Portal stehen im kostenlosen Test offen.

Weitere Ausschreibungen in Südafrika

Ähnliche offene Ausschreibungen

  1. SIC 26003 CIDB 1 HOAC HO 57813
    Transnet SOC Ltd Frist: 30.10.2026
  2. APPOINTMENT OF A SERVICE PROVIDER FOR THE SUPPLY, REFURBISHMENT, INSTALLATION AND COMMISSIONING OF MCC AND ASSOCIATED ELECTRICAL CONTROL INFRASTRUCTURE AT THE BELA-BELA WASTEWATER TREATMENT WORKS – SCADA IMPLEMENTATION PHASE 1A
    Bela Bela Local Municipality Frist: 30.10.2026
  3. FOR THE MAINTENANCE OF RAILWAY TRACK WITH AN ON-TRACK BALLAST LOW PRODUCTION SCREENING MACHINES FOR A PERIOD OF TWENTY-FOUR (24) MONTHS.
    Transnet SOC Ltd Frist: 30.10.2026
  4. Electrical services and maintenance | Pier1 Electrical Power Systems Protection
    Transnet SOC Ltd Frist: 30.10.2026
  5. Provision of repairs for aircon at Simphiwe’s office, Admin Ground floor, First floor and Third floor faulty aircon.
    Transnet SOC Ltd Frist: 30.10.2026
  6. The provision of Facilities Management Services Non-Technical Services (Cleaning, Gardening, Pest Control, Hygiene and Waste Management Service) on an as and when required basis for the Upington Zone in the Northern Cape Province of the GEMMA Cluster for a period of 36 months.
    Eskom Frist: 31.10.2026
  7. The provision of Facilities Management Services Non-Technical Services (Cleaning, Gardening, Pest Control, Hygiene and Waste Management Service) on an as and when required basis for the Kimberley Zone in the Northern Cape Province of the GEMMA Cluster for a period of 36 months.
    Eskom Frist: 31.10.2026
  8. WITHDRAWL FOR THE PROVISION OFFICE CLEANING SERVICES FOR PERIOD OF FIVE (5) YEARS AT KENDAL POWER STATION
    Eskom Frist: 02.11.2026