公共入札 受付中
Travaux d'entretien courant de la piste/ITR (Infrastructure de Transport Rural) Ourarou - Won - Tchori, long de 23 km ; de la piste/ITR (Infrastructure de Transport Rural) Pèrèrè - Kpanè long de 09 km ; de la piste/ITR (Infrastructure de Transport Rural) Nassy - Gninsy long de 07 km par la Méthode HIMO
英語: Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
公告全文と資料を見る:無料トライアルを始める
14日間の無料トライアル。カードは不要です。
- 発注者
- Commune de Pèrèrè
- 国
- ベナン
- 締切
- 2026/11/0910日後
- 分野
- 建設・土木
- 公開日
- 2026/10/19
詳細な説明、資料、発注機関の連絡先、公式ポータルへのリンクは無料トライアルでご覧いただけます。
類似の受付中の入札
-
Construction works of three (03) modules of three (03) classrooms without equipment for the benefit of EPP Somè, Zèko quartier B and Kpozoun Lokoli; and construction and equipping of modules of three (03) classrooms + office and store for the benefit of EPP Za-Zounmè and Houanvèli-Tankpa (Za-Tanta)., Construction works of two (02) modules of latrines with four (04) cabins for the benefit of EM de Davègo and the school group of EPP Agongbo A, B and EM
Commune de Za-Kpota 締切: 2026/11/03
-
Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
Commune de Dogbo 締切: 2026/11/04
-
Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
Commune d'Agbangninzou 締切: 2026/11/05
-
Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots
Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT) 締切: 2026/11/05
-
Construction works of a palm oil storage center in Adja-Ouèrè.
Agence Territoriale de Développement Agricole Pôle 6 締切: 2026/11/06
-
Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
Commune de Sô Ava 締切: 2026/11/06
-
Construction of school infrastructure (Recovery) (prioritization of local materials)
Commune de Grand Popo 締切: 2026/11/09
-
Partial construction of the fence of the Sakabansi health center (lot 1); Acquisition of medical equipment for the Nikki health center and the Sounon séro hospital (lot 2).
Commune de Nikki 締切: 2026/11/09