Licitação pública Aberta

FOR THE SUPPLY, INSTALLATION, TESTING, COMMISSIONING, AND CERTIFICATION OF ELECTRIC CHAIN HOISTS FOR BAYHEAD WAGONS AT TRANSNET ENGINEERING DURBAN ON A MONTH-TO-MONTH BASIS FOR A PERIOD OF FOUR (4) MONTHS.

Prazo
19 de nov. de 2026em 16 dias
Comprador
Transnet SOC Ltd

Transnet SOC Ltd (África do Sul) convida à apresentação de propostas para esta licitação. As propostas devem ser entregues até 19 de nov. de 2026.

Comprador
Transnet SOC Ltd
País
África do Sul
Prazo
19 de nov. de 2026em 16 dias
Publicado
20 de out. de 2026

A descrição completa, os documentos, os contatos do comprador e o link para o portal oficial ficam disponíveis no teste grátis.

Mais licitações na África do Sul

Licitações abertas semelhantes

  1. Supply and Delivery of miscellaneous Lab Supplies
    Perishable Products Export Control Board Prazo: 3 de nov. de 2026
  2. The Road Accident Fund (RAF) wishes to appoint a suitable service provider for the Hiring of Branded Mobile Cancer Screening Truck at RAF Head Office, Centurion.
    Road Accident Fund Prazo: 3 de nov. de 2026
  3. Supply and delivery of 50% drain valve at Tutuka Power Station for a once off order
    Eskom Prazo: 3 de nov. de 2026
  4. Purchase, Collect and Remove used transformer oil plus or minus 70 000 LT at NTCSA North Grid (Spitskop Substation)
    Eskom Prazo: 3 de nov. de 2026
  5. SUPPLY AND DELIVERY OF SENSORS TO MATIMBA POWER STATION FOR FIVE YEARS ON AN AS AND WHEN REQUIRED BASIS
    Eskom Prazo: 3 de nov. de 2026
  6. Lethabo Power Station Maturation Pond Fencing Refurbishment
    Eskom Prazo: 3 de nov. de 2026
  7. NOTIFICATION OF TENDERS RECEIVED FOR E3505GXMPKRI that closed on 07.10.2026 : Transportation of Kriel Power Station employees residing in the Komati Power Station area on a daily basis for a period of 5 years
    Eskom Prazo: 3 de nov. de 2026
  8. The provision of specialised facilities services (Heating Ventilation and Air Conditioning services) at Highveld Zone for Eskom Distribution Property Management Mpumalanga operating unit on as and when required basis for a period of 60 months
    Eskom Prazo: 3 de nov. de 2026