Licitação pública Aberta
Upgradation of 100 KVA to 250 KVA transformer for supplying electricity to motor pump sets installed at Shiwane river and for supplying water inside the campus TC AND S BSF Hazaribag
Veja o edital completo e os documentos: comece o teste grátis
Teste grátis de 14 dias. Sem cartão.
- Comprador
- DG,BSF,MHA
- País
- Índia
- Prazo
- 31 de out. de 2026hoje
- Setor
- Energia e serviços públicos
- Publicado
- 22 de out. de 2026
A descrição completa, os documentos, os contatos do comprador e o link para o portal oficial ficam disponíveis no teste grátis.
Licitações abertas semelhantes
-
LAYING OF ALUMINIUM CABLE INCLUDING HDD CROSSING
Department of Agricultural Research and Education Prazo: 31 de out. de 2026
-
LED Based Classification Light
Ministry of Railways Prazo: 31 de out. de 2026
-
Power cable pre-assembled
Ministry of Railways Prazo: 31 de out. de 2026
-
58/NIT/EE(E)/PCED/2026-27
Central Public Works Department (CPWD) Prazo: 31 de out. de 2026
-
1) (PL) POWER DIODE PLASSER PART NO. K9M6+L+SKR 20/8 MAKE PLASSER.
2) (PL) TOGGLE HEAD PLASSER PART NO-EL-T7190-DL3/ROT, MAKE -PLASSER.
3) (PL) REMOTE PLASSER PART NO-SX244.1003, MAKE -PLASSER.
4) (PL) TRANSDUCER PLASSER PART NO. 323.801/004/002 MAKE PLASSER.
5) (PL) Transducer PLASSER PART NO. 340.807/001/001 MAKE PLASSER.
Ministry of Railways Prazo: 31 de out. de 2026
-
Annual Maintenance Contract for Cummins makes 02 Nos. DieselEngines Model NTA14R and 02 Nos. of Diesel Generator Set Model QSB 5.9of HS-SPART for the period of 48 months at ELS/KYN
Ministry of Railways Prazo: 31 de out. de 2026
-
Set of Complete Panels & Harnessed Cables for WAG-9HC of Three Phase Electric Locomotives
Ministry of Railways Prazo: 31 de out. de 2026
-
Design, Supply, Erection, Testing & Commissioning of Traction Sub Stations (Scott/V
connected) with associated Switching Posts (SP/SSP) for 2 x 25 KV feeding system along with provision of associated SCADA system in upgradation of Electric Traction System from 1x25KV to 2x25KV Traction System for Kumandih- Garhwa Section of ECR to meet 3000 MT loading target.
Ministry of Railways Prazo: 31 de out. de 2026