Veřejná zakázka Otevřená

Огнеупорные материалы и теплоизоляционные изделия (согласно ТЗ) / Ўтга чидамли материаллар ва иссиқлик изоляцияси буюмлари (Техник топширикка мувофик)

Zadavatel
"O`ZBEKISTON METALLURGIYA KOMBINATI" AJ
Země
Uzbekistán
Lhůta
12. 11. 2026za 13 dní
Hodnota
USD 50 060
Obor
Stavebnictví a inženýrské stavby
Zveřejněno
29. 10. 2026

Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.

Další zakázky: Uzbekistán

Podobné otevřené zakázky

  1. Current repair of the infrastructure of the Embassy of Uzbekistan in Astana
    Дипломатик сервис хизмати ДМ Lhůta: 30. 10. 2026
  2. Cargo transportation service for the purpose of repairing internal roads in the territory of Muynoq district, asphalt, October
    Муйнок туман Ободонлаштириш бошкармаси Lhůta: 30. 10. 2026
  3. Execution of works to transport excavated soil in the section from PK10+00 to PK 14+00 of the water supply channel of the So'x HPP facility on the So'x River in the So'x district of Fergana region
    АО GIDROMAXSUSQURILISH Lhůta: 30. 10. 2026
  4. ABCD (Asphalt Binder Cracking Device) with an installed freezing (climatic) chamber
    Avtomobil yo`llari ilmiy-tadqiqot instituti DM Lhůta: 30. 10. 2026
  5. Major repair works to create comfortable conditions for persons with disabilities at the Olmaliq BXM binosi.
    "O`ZBEKISTON SANOAT-QURILISH BANK" ATB Lhůta: 30. 10. 2026
  6. Works to connect the AT center and 245-EATS with the Head Office of "Oʻzsanoatqurilishbank" ATB via direct fiber-optic communication cable.
    "O`ZBEKISTON SANOAT-QURILISH BANK" ATB Lhůta: 30. 10. 2026
  7. Valuation of a land plot with a total area of 0.08 hectares intended for the construction of 2 individual residential houses, located in the territory of Chuya MFY, Nurota district
    Давлат активларини бошкариш агентлиги Навоий вилоят худудий бошкармаси Lhůta: 30. 10. 2026
  8. Development of design and estimate documentation
    "DAVLAT KADASTRLARI PALATASINING SURXONDARYO VILOYATI BOSHQARMASI" Lhůta: 2. 11. 2026