Offentligt udbud Lukket

"Gidroproyekt" AJ bazasida lokal hisoblash tarmog'ini (LHT), kirishni nazorat qilish va boshqarish tizimini (KNB Tizimi) hamda videokuzatuv tizimini loyihalash, o'rnatish, sozlab ishga tushirish

På engelsk: Design, installation, configuration and commissioning of a local area network (LAN), an access control and management system (ACS System) and a video surveillance system at the base of "Gidroproyekt" JSC

Frist
6. nov. 2026
Værdi
UZS 834.200.000
Køber
Gidroproekt Aj

Dette udbud er lukket og modtager ikke længere tilbud.

Lignende åbne udbud · Flere udbud: Usbekistan

Køber
Gidroproekt Aj
Land
Usbekistan
Frist
6. nov. 2026
Værdi
UZS 834.200.000
Offentliggjort
30. okt. 2026

Den fulde beskrivelse, dokumenterne, ordregiverens kontaktoplysninger og linket til den officielle portal åbner i den gratis prøveperiode.

Flere udbud: Usbekistan

Lignende åbne udbud

  1. SERVICES FOR ASSESSING THE OPERATIONAL SAFETY OF THE AMMUNITION DEPOT
    Ao "O'zsuvloyiha" Frist: 6. nov. 2026
  2. Valuation service for the buildings of the "Shahrixon oil base" located in Terakagi MFY, S.Samiev street, house 1, Shahrixon district.
    Давлат активларини бошкариш бошкармаси Frist: 6. nov. 2026
  3. Supply and installation of automated small stations for carrying out background monitoring of air pollution (347 procurements)
    Государственный комитет РУз по экологии и охране окружающей среды Frist: 6. nov. 2026
  4. Partial demolition-dismantling of the 4-storey building of the "Diagnostic Treatment and Health Improvement Center" located at No. 2 Burjlik street, Kokand city, Fergana region
    Asakabank Frist: 6. nov. 2026
  5. Supply of stone-sand-gravel mixture for the current repair of internal farm roads in Sardoba district of Syrdarya region
    Ободонлаштириш бошкармаси Frist: 6. nov. 2026
  6. FOR SELECTING THE BEST OFFER
    Джизакское областное управление здравоохранения Frist: 6. nov. 2026
  7. Selection
    O’zbekiston Texnologik Metallar Kombinati Aj Frist: 9. nov. 2026
  8. Development of the "Environmental Impact Statement" project within the framework of the "Implementation of reconstruction works at stations" object
    "Toshtemiryo'lloyiha" MCHJ Frist: 9. nov. 2026