公共招标 进行中
Design and Build of Urban Infrastructure Works at Motithang, Changangkha, Chang Gumji and Chang Ganey areas, Thimphu Thromde.
- 截止日期
- 2026年11月17日14 天后
- 采购方
- Root, Autonomus Bodies, Thimphu Thromde, Procurement Section, AFD
Root, Autonomus Bodies, Thimphu Thromde, Procurement Section, AFD(不丹)正在就本项目招标。 投标截止日期:2026年11月17日。
- 采购方
- Root, Autonomus Bodies, Thimphu Thromde, Procurement Section, AFD
- 国家
- 不丹
- 截止日期
- 2026年11月17日14 天后
- 行业
- 建筑与土木工程
- 发布时间
- 2026年10月2日
完整描述、文件、采购方联系方式和官方门户链接在免费试用中开放。
类似的开放招标
-
Relocation and Upgradation of Class A Trongsa Met Station
Root, Autonomus Bodies, National Center for Hydrology and Meteorology, National Center for Hydrology and Meteorology 截止日期: 2026年11月4日
-
INSTALLATION OF STREETLIGHT AT DEWATHANG AND SAMDRUP JONGKHAR
Root, Autonomus Bodies, Samdrup Jongkhar Thromde, Samdrup Jongkhar Thromde 截止日期: 2026年11月4日
-
Construction of Sanitary and Phydosanitary Service (SPS) Centre at Phuentsholing
Ministry of Agriculture and Livestock 截止日期: 2026年11月4日
-
Construction of Rumrang Irrigation Scheme, Buli Nangkhor
Ministry of Home Affairs, Zhemgang, Dzongkhag Administration Zhemgang 截止日期: 2026年11月5日
-
Construction of Monsoon Structures on Gongrizomsa-Linzin PNH, Nganglam. Plum Toe, Gabion Retaining Wall at Ch. 70 Km and Precast RCC Box Culvert with RRM/Plum Concrete Wing walls, Gabion Wall and V-shaped drain at Ch. 74.4Km
Ministry of Infrastructure and Transport, Department of Surface Transport, Regional Office, DoST, Samdrup Jongkhar, Procurement Section, DoST, Samdrup Jongkhar 截止日期: 2026年11月6日
-
Installation & Maintenance of W-beam, Crash Barrier along with the Installation of Road Signages & Delineators and Construction of Gabion Box Mesh Crash barrier along Gongrizomsa-Lingzin PNH.
Ministry of Infrastructure and Transport, Department of Surface Transport, Regional Office, DoST, Samdrup Jongkhar, Procurement Section, DoST, Samdrup Jongkhar 截止日期: 2026年11月6日
-
Construction of Monsoon Structures on Dechheling DR, Nganglam. Gabion Toe R/wall, R/wall and Gabion R/wall at Ch. 1.6Km. Gabion Toe wall, Gabion R/wall at Ch. 2.3 Km. Plum Toe wall for Bridge Abutment at Ch. 4.5 Km. Gabion Check Dam/wall at Ch. 9.0 Km
Ministry of Infrastructure and Transport, Department of Surface Transport, Regional Office, DoST, Samdrup Jongkhar, Procurement Section, DoST, Samdrup Jongkhar 截止日期: 2026年11月6日
-
Construction of Farm Road from Lhonjuna to Amoochu
Ministry of Home Affairs, Haa, Dzongkhag Administration, Haa 截止日期: 2026年11月6日