공공 입찰 진행 중
Travaux de réhabilitation des Accès et Traversées de Cotonou en appui à la mobilité urbaine durable dans l’agglomération de Cotonou (ATC mobilité)
영어: Rehabilitation works on the Accesses and Crossings of Cotonou in support of sustainable urban mobility in the Cotonou agglomeration (ATC mobility)
- 마감일
- 2026. 11. 12.8일 후
- 발주기관
- SIRAT - Road Infrastructure and Land Management Company
SIRAT - Road Infrastructure and Land Management Company(베냉)이(가) 이 입찰에 대한 응찰을 받고 있습니다. 응찰 마감일은 2026. 11. 12.입니다.
- 발주기관
- SIRAT - Road Infrastructure and Land Management Company
- 국가
- 베냉
- 마감일
- 2026. 11. 12.8일 후
- 분야
- 건설 및 토목
- 공고일
- 2026. 9. 22.
전체 설명, 문서, 발주 기관 연락처, 공식 포털 링크는 무료 체험에서 확인할 수 있습니다.
비슷한 진행 중 입찰
-
Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
Commune de Dogbo 마감일: 2026. 11. 4.
-
Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
Commune d'Agbangninzou 마감일: 2026. 11. 5.
-
Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots
Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT) 마감일: 2026. 11. 5.
-
Construction and equipment works of school infrastructures as well as the acquisition and installation of solar street lamps in the EPP Boko C and Ouénou B
Commune de N'dali 마감일: 2026. 11. 6.
-
Construction works of a palm oil storage center in Adja-Ouèrè.
Agence Territoriale de Développement Agricole Pôle 6 마감일: 2026. 11. 6.
-
Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
Commune de Sô Ava 마감일: 2026. 11. 6.
-
Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
Commune de Pèrèrè 마감일: 2026. 11. 9.
-
Construction of school infrastructure (Recovery) (prioritization of local materials)
Commune de Grand Popo 마감일: 2026. 11. 9.