Offentligt udbud Åbent

Package No: e-GP/CTCRP/PAIK/DR-01 and DR-02 Construction/Improvement of 06 nos. Drain Under Paikgacha Pourashava, District: Khulna.

Frist
12. nov. 2026om 9 dage
Køber
Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Local Government Engineering Department (LGED), PIU Office of Paikgacha Pourashava, Khulna

Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Local Government Engineering Department (LGED), PIU Office of Paikgacha Pourashava, Khulna (Bangladesh) indhenter tilbud i dette udbud. Fristen for tilbud er 12. nov. 2026.

Køber
Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Local Government Engineering Department (LGED), PIU Office of Paikgacha Pourashava, Khulna
Land
Bangladesh
Frist
12. nov. 2026om 9 dage
Branche
Byggeri og anlæg
Offentliggjort
8. okt. 2026

Den fulde beskrivelse, dokumenterne, ordregiverens kontaktoplysninger og linket til den officielle portal åbner i den gratis prøveperiode.

Flere udbud: Bangladesh · Udbud byggeri: Bangladesh

Lignende åbne udbud

  1. Repair and Maintenance Works of Clinic Building at Ayubpur Union Health & Family Welfare Center (UH&FWC) at Shibpur Upazila in Narsingdi District.
    Ministry of Health and Family Welfare, Health Engineering Department (HED), HED, Gazipur Division, Gazipur Frist: 3. nov. 2026
  2. Construction of security patrol road from Padma Oil depot corner to new RFFS area Guard house in/c. other allied works at HSIA, Kurmitola, Dhaka.
    Ministry of Civil Aviation & Tourism, Civil Aviation Authority of Bangladesh, Office of the Superintending Engineer, Civil Circle Frist: 3. nov. 2026
  3. Re-construction of west side security boundary wall & protection of road from old graveyard towards Dormitory building in/c. other allied works at HSIA, Kurmitola, Dhaka.
    Ministry of Civil Aviation & Tourism, Civil Aviation Authority of Bangladesh, Office of the Superintending Engineer, Civil Circle Frist: 3. nov. 2026
  4. EUCPW-271 A.. Construction of 4 (four) storied Dormatory Buoilding at karnafuli
    Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Local Government Engineering Department (LGED), Office of the Upazila Engineer, LGED, Karnafuli, Chattogram Frist: 3. nov. 2026
  5. Installation work of 80kWp on-grid solar system including design, supply, testing and commissioning on the rooftop of Block C of Sarak Bhaban, Tejgaon, Dhaka through Ferry Construction Division, RHD, Dhaka during the Fiscal Year 2026-27.
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Ferry Construction Division, Dhaka Frist: 3. nov. 2026
  6. Installation work of 44kWp on-grid solar system including design, supply, testing and commissioning on the rooftop of DTCA Building (RHD Part), Tejgaon, Dhaka through Ferry Construction Division, RHD, Dhaka during the Fiscal Year 2026-27.
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Ferry Construction Division, Dhaka Frist: 3. nov. 2026
  7. Installation work of 40 KWp on-grid solar system including design, supply, testing and commissioning on the rooftop of Steel Building Sarak Bhaban, Tejgaon, Dhaka through Ferry Construction Division, RHD, Dhaka during the fiscal year 2026-27
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Ferry Construction Division, Dhaka Frist: 3. nov. 2026
  8. Repairing Damaged portion with with carpeting & seal coat with beam palisiding and Saucer Drain(Differenf Location) at Ch.2+ 738 to Ch.Ch.6+000 Different Location of Madaripur-Kalkini-Bhurghata (Z-8604) Road Under Madaripur Road Division during the year 2026-2027.
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Madaripur Road Division Frist: 3. nov. 2026