공공 입찰 진행 중

Travaux de construction de trois (03) modules de trois (03) salles de classes sans équipement au profit des EPP Somè, Zèko quartier B et Kpozoun Lokoli ; et de construction et d’équipement de modules de trois (03) salles de classes + bureau et magasin au profit des EPP Za-Zounmè et Houanvèli-Tankpa (Za-Tanta)., Travaux de construction de deux (02) modules de latrines à quatre (04) cabines au profit de l'EM de Davègo et du groupe scolaire de l'EPP Agongbo A, B et EM

영어: Construction works of three (03) modules of three (03) classrooms without equipment for the benefit of EPP Somè, Zèko quartier B and Kpozoun Lokoli; and construction and equipping of modules of three (03) classrooms + office and store for the benefit of EPP Za-Zounmè and Houanvèli-Tankpa (Za-Tanta)., Construction works of two (02) modules of latrines with four (04) cabins for the benefit of EM de Davègo and the school group of EPP Agongbo A, B and EM

공고 전문과 문서 보기: 무료 체험 시작

14일 무료 체험. 카드가 필요 없습니다.

발주기관
Commune de Za-Kpota
국가
베냉
마감일
2026. 11. 3.4일 후
분야
건설 및 토목
공고일
2026. 10. 9.

전체 설명, 문서, 발주 기관 연락처, 공식 포털 링크는 무료 체험에서 확인할 수 있습니다.

더 많은 입찰: 베냉

비슷한 진행 중 입찰

  1. Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
    Commune de Dogbo 마감일: 2026. 11. 4.
  2. Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
    Commune d'Agbangninzou 마감일: 2026. 11. 5.
  3. Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots
    Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT) 마감일: 2026. 11. 5.
  4. Construction works of a palm oil storage center in Adja-Ouèrè.
    Agence Territoriale de Développement Agricole Pôle 6 마감일: 2026. 11. 6.
  5. Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
    Commune de Sô Ava 마감일: 2026. 11. 6.
  6. Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
    Commune de Pèrèrè 마감일: 2026. 11. 9.
  7. Construction of school infrastructure (Recovery) (prioritization of local materials)
    Commune de Grand Popo 마감일: 2026. 11. 9.
  8. Partial construction of the fence of the Sakabansi health center (lot 1); Acquisition of medical equipment for the Nikki health center and the Sounon séro hospital (lot 2).
    Commune de Nikki 마감일: 2026. 11. 9.