Cung cấp dịch vụ tư vấn kiểm toán quyết toán công trình sửa chữa lớn hoàn thành - Công trình Đại tu Tổ máy S1 - NMNĐ Vĩnh Tân 2 năm 2026

Anglicky: Provision of consulting services for audit of final accounts of completed major repair works - S1 Turbine Unit Overhaul Project - Vinh Tan 2 Thermal Power Plant in 2026

Lhůta
4. 11. 2026
Hodnota
VND 977 856 870
Zadavatel
Công Ty Nhiệt Điện VĨNH Tân - Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN

Tato zakázka je uzavřená a už nepřijímá nabídky.

Podobné otevřené zakázky · Další zakázky: Vietnam

Zadavatel
Công Ty Nhiệt Điện VĨNH Tân - Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN
Země
Vietnam
Lhůta
4. 11. 2026
Hodnota
VND 977 856 870
Obor
Profesní a inženýrské služby
Zveřejněno
15. 10. 2026

Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.

Další zakázky: Vietnam · Inženýrské služby: veřejné zakázky (Vietnam)

Podobné otevřené zakázky

  1. Global Programme Newsletter, Productivity Ecosystems for Decent Work
    ILO Lhůta: 4. 11. 2026
  2. Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
    CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Lhůta: 4. 11. 2026
  3. Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
    Ban QLDA Đầu tư Xây dựng xã Thanh An Lhůta: 4. 11. 2026
  4. TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
    TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Lhůta: 4. 11. 2026
  5. Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Lhůta: 4. 11. 2026
  6. Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
    Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Lhůta: 4. 11. 2026
  7. Consulting services for Construction Supervision of the construction project, phase 4 of 2027
    Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Lhůta: 4. 11. 2026
  8. Installation of monitoring for 1-phase capacitive voltage transformer for bays 273, 274 of Nhon Trach 220kV substation
    Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Lhůta: 5. 11. 2026