Veřejná zakázka Otevřená

Global Programme Newsletter, Productivity Ecosystems for Decent Work

Lhůta
4. 11. 2026dnes
Zadavatel
ILO

ILO (Vietnam) vyhlašuje tuto zakázku a přijímá nabídky. Nabídky je třeba podat do 4. 11. 2026.

Zadavatel
ILO
Země
Vietnam
Lhůta
4. 11. 2026dnes
Obor
Profesní a inženýrské služby
Zveřejněno
27. 10. 2026

Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.

Další zakázky: Vietnam · Inženýrské služby: veřejné zakázky (Vietnam)

Podobné otevřené zakázky

  1. Provision of consulting services for audit of final accounts of completed major repair works - S1 Turbine Unit Overhaul Project - Vinh Tan 2 Thermal Power Plant in 2026
    Công Ty Nhiệt Điện VĨNH Tân - Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Lhůta: 4. 11. 2026
  2. Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001
    Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí Lhůta: 4. 11. 2026
  3. Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
    CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Lhůta: 4. 11. 2026
  4. Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
    Ban QLDA Đầu tư Xây dựng xã Thanh An Lhůta: 4. 11. 2026
  5. TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
    TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Lhůta: 4. 11. 2026
  6. Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Lhůta: 4. 11. 2026
  7. Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
    Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Lhůta: 4. 11. 2026
  8. Consulting services for Construction Supervision of the construction project, phase 4 of 2027
    Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Lhůta: 4. 11. 2026