Veřejná zakázka Otevřená
Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, gói thầu số PVEPNCS-GC- 2026-001
Anglicky: Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001
- Lhůta
- 4. 11. 2026dnes
- Hodnota
- VND 7 845 000 000
- Zadavatel
- Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
14 dní zkušební verze zdarma. Bez karty.
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí (Vietnam) vyhlašuje tuto zakázku a přijímá nabídky. Nabídky je třeba podat do 4. 11. 2026. Předpokládaná hodnota: VND 7 845 000 000. Nabídky se podávají v listinné podobě.
- Zadavatel
- Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
- Země
- Vietnam
- Lhůta
- 4. 11. 2026dnes
- Hodnota
- VND 7 845 000 000
- Obor
- Profesní a inženýrské služby
- Zveřejněno
- 1. 10. 2026
Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.
Další zakázky: Vietnam · Inženýrské služby: veřejné zakázky (Vietnam)
Podobné otevřené zakázky
-
Provision of consulting services for audit of final accounts of completed major repair works - S1 Turbine Unit Overhaul Project - Vinh Tan 2 Thermal Power Plant in 2026
Công Ty Nhiệt Điện VĨNH Tân - Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Lhůta: 4. 11. 2026
-
Global Programme Newsletter, Productivity Ecosystems for Decent Work
ILO Lhůta: 4. 11. 2026
-
Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Lhůta: 4. 11. 2026
-
Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
Ban QLDA Đầu tư Xây dựng xã Thanh An Lhůta: 4. 11. 2026
-
TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Lhůta: 4. 11. 2026
-
Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Lhůta: 4. 11. 2026
-
Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Lhůta: 4. 11. 2026
-
Consulting services for Construction Supervision of the construction project, phase 4 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Lhůta: 4. 11. 2026