Przetarg publiczny Zamknięty
Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, gói thầu số PVEPNCS-GC- 2026-001
Po angielsku: Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001
- Termin
- 4 lis 2026
- Wartość
- VND 7 845 000 000
- Zamawiający
- Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
Ten przetarg jest zamknięty i nie przyjmuje już ofert.
Podobne otwarte przetargi · Więcej przetargów w Wietnamie
Zobacz pełne ogłoszenie i dokumenty: rozpocznij bezpłatny okres próbny
14 dni bezpłatnego okresu próbnego. Bez karty.
- Zamawiający
- Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
- Kraj
- Wietnam
- Termin
- 4 lis 2026
- Wartość
- VND 7 845 000 000
- Branża
- Usługi profesjonalne i inżynieryjne
- Opublikowano
- 1 paź 2026
Pełny opis, dokumenty, kontakty zamawiającego i link do oficjalnego portalu są dostępne w bezpłatnym okresie próbnym.
Więcej przetargów w Wietnamie · Przetargi inżynieryjne w Wietnamie
Podobne otwarte przetargi
-
Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Termin: 4 lis 2026
-
Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
Ban QLDA Đầu tư Xây dựng xã Thanh An Termin: 4 lis 2026
-
TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Termin: 4 lis 2026
-
Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Termin: 4 lis 2026
-
Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Termin: 4 lis 2026
-
Consulting services for Construction Supervision of the construction project, phase 4 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Termin: 4 lis 2026
-
Installation of monitoring for 1-phase capacitive voltage transformer for bays 273, 274 of Nhon Trach 220kV substation
Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Termin: 5 lis 2026
-
Consulting services for valuation of liquidation of 125MVA transformer at Bac Lieu substation
Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Termin: 5 lis 2026