Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, gói thầu số PVEPNCS-GC- 2026-001

英語: Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001

締切
2026/11/04今日
金額
VND 7,845,000,000
発注者
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí

Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí(ベトナム)がこの入札案件の応札を募集しています。 応札期限は2026/11/04です。 予定価格:VND 7,845,000,000。 応札は書面で提出します。

発注者
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
国
ベトナム
締切
2026/11/04今日
金額
VND 7,845,000,000
分野
専門・エンジニアリングサービス
公開日
2026/10/01

詳細な説明、資料、発注機関の連絡先、公式ポータルへのリンクは無料トライアルでご覧いただけます。

その他の入札:ベトナム · ベトナムのエンジニアリング入札

類似の受付中の入札

  1. Provision of consulting services for audit of final accounts of completed major repair works - S1 Turbine Unit Overhaul Project - Vinh Tan 2 Thermal Power Plant in 2026
    Công Ty Nhiệt Điện VĨNH Tân - Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN 締切: 2026/11/04
  2. Global Programme Newsletter, Productivity Ecosystems for Decent Work
    ILO 締切: 2026/11/04
  3. Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
    CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP 締切: 2026/11/04
  4. Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
    Ban QLDA Đầu tư Xây dựng xã Thanh An 締切: 2026/11/04
  5. TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
    TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam 締切: 2026/11/04
  6. Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh 締切: 2026/11/04
  7. Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
    Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN 締切: 2026/11/04
  8. Consulting services for Construction Supervision of the construction project, phase 4 of 2027
    Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC 締切: 2026/11/04