Offentligt udbud Lukket

Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, gói thầu số PVEPNCS-GC- 2026-001

På engelsk: Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001

Frist
4. nov. 2026
Værdi
VND 7.845.000.000
Køber
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí

Dette udbud er lukket og modtager ikke længere tilbud.

Lignende åbne udbud · Flere udbud: Vietnam

Køber
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
Land
Vietnam
Frist
4. nov. 2026
Værdi
VND 7.845.000.000
Branche
Professionelle og tekniske tjenester
Offentliggjort
1. okt. 2026

Den fulde beskrivelse, dokumenterne, ordregiverens kontaktoplysninger og linket til den officielle portal åbner i den gratis prøveperiode.

Flere udbud: Vietnam · Udbud ingeniørydelser: Vietnam

Lignende åbne udbud

  1. Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
    CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Frist: 4. nov. 2026
  2. Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
    Ban QLDA Đầu tư Xây dựng xã Thanh An Frist: 4. nov. 2026
  3. TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
    TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Frist: 4. nov. 2026
  4. Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 4. nov. 2026
  5. Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
    Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Frist: 4. nov. 2026
  6. Consulting services for Construction Supervision of the construction project, phase 4 of 2027
    Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Frist: 4. nov. 2026
  7. Installation of monitoring for 1-phase capacitive voltage transformer for bays 273, 274 of Nhon Trach 220kV substation
    Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Frist: 5. nov. 2026
  8. Consulting services for valuation of liquidation of 125MVA transformer at Bac Lieu substation
    Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Frist: 5. nov. 2026