Julkinen hankinta Päättynyt

Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, gói thầu số PVEPNCS-GC- 2026-001

Englanniksi: Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001

Määräaika
4.11.2026
Arvo
VND 7 845 000 000
Hankintayksikkö
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí

Tämä tarjouspyyntö on päättynyt, eikä siihen voi enää jättää tarjouksia.

Samankaltaiset avoimet tarjouspyynnöt · Lisää tarjouspyyntöjä: Vietnam

Hankintayksikkö
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí
Maa
Vietnam
Määräaika
4.11.2026
Arvo
VND 7 845 000 000
Ala
Ammatilliset ja insinööripalvelut
Julkaistu
1.10.2026

Koko kuvaus, asiakirjat, hankintayksikön yhteystiedot ja linkki viralliseen portaaliin avautuvat ilmaisessa kokeilussa.

Lisää tarjouspyyntöjä: Vietnam · Insinööripalvelut: tarjouspyynnöt (Vietnam)

Samankaltaiset avoimet tarjouspyynnöt

  1. Global Programme Newsletter, Productivity Ecosystems for Decent Work
    ILO Määräaika: 4.11.2026
  2. Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
    CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP Määräaika: 4.11.2026
  3. Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
    Ban QLDA Đầu tư Xây dựng xã Thanh An Määräaika: 4.11.2026
  4. TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
    TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam Määräaika: 4.11.2026
  5. Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Määräaika: 4.11.2026
  6. Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
    Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN Määräaika: 4.11.2026
  7. Consulting services for Construction Supervision of the construction project, phase 4 of 2027
    Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Määräaika: 4.11.2026
  8. Installation of monitoring for 1-phase capacitive voltage transformer for bays 273, 274 of Nhon Trach 220kV substation
    Công Ty Truyền Tải Điện 4 - Chi Nhánh TỔNG Công Ty Truyền Tải Điện Quốc Gia Määräaika: 5.11.2026