공공 입찰 진행 중
Travaux de construction d’un réservoir d’une capacité de 1 500 m³, d’un château d’eau d’une capacité de 250 m³
영어: Construction works of a reservoir with a capacity of 1,500 m³ and a water tower with a capacity of 250 m³
- 마감일
- 2026. 11. 17.13일 후
- 발주기관
- Unité de Gestion du Projet du Réseau de Distribution d’Eau de la Ville de Nouakchott
Unité de Gestion du Projet du Réseau de Distribution d’Eau de la Ville de Nouakchott(모리타니)이(가) 이 입찰에 대한 응찰을 받고 있습니다. 응찰 마감일은 2026. 11. 17.입니다.
- 발주기관
- Unité de Gestion du Projet du Réseau de Distribution d’Eau de la Ville de Nouakchott
- 국가
- 모리타니
- 마감일
- 2026. 11. 17.13일 후
- 분야
- 건설 및 토목
- 공고일
- 2026. 10. 15.
전체 설명, 문서, 발주 기관 연락처, 공식 포털 링크는 무료 체험에서 확인할 수 있습니다.
비슷한 진행 중 입찰
-
Recruitment of a firm for construction supervision of four rural tracks for opening up the wilaya of Trarza
Projet de Résilience et de Développement Communautaire 마감일: 2026. 11. 9.
-
Works to complete the construction of the School of Higher Commercial Studies (E.H.E.C.) in Nouakchott
Ministère de l’Habitat, de l’Urbanisme et de l’Aménagement du Territoire 마감일: 2026. 11. 9.
-
Works for the rehabilitation of 07 gabion weirs within the framework of the PTBA 2026 development program in one (01) single lot
Projet de Gestion durable des Ressources Naturelles Equipement Communal et de Structuration des Producteurs 마감일: 2026. 11. 9.
-
Works for the construction of 15 reconnaissance boreholes convertible into 05 production boreholes in 05 localities distributed across the wilayas of the two Hodhs, in a single lot
Projet de Gestion durable des Ressources Naturelles Equipement Communal et de Structuration des Producteurs 마감일: 2026. 11. 10.
-
Works for the development of 09 mixed boulis and one market gardening bouli within the framework of the PTBA 2026 development program in three (03) separate lots
Projet de Gestion durable des Ressources Naturelles Equipement Communal et de Structuration des Producteurs 마감일: 2026. 11. 11.
-
Works for the construction of two rural tracks, one between N'tekane and Dar Salam and the other between Moissa Niawly and the Paved Road ROSSO-BOGHE in the communes of N'TEKANE and LEKSSEIBA2
Projet de Résilience et de Développement Communautaire 마감일: 2026. 11. 12.
-
Works for the construction of two rural tracks, one between N'DIAGO and GHAHIRA and the other between SBEIKHE and ZIRE2 in the commune of N'DIAGO
Projet de Résilience et de Développement Communautaire 마감일: 2026. 11. 12.
-
Works for the protection of 15 rain-fed agricultural zones within the framework of the 2026 development program in two (02) separate lots
Projet de Gestion durable des Ressources Naturelles Equipement Communal et de Structuration des Producteurs 마감일: 2026. 11. 12.