Offentligt udbud Åbent

Painting of Operational boundary wall (RWY 24 side) from NTB to DVOR, New Fire Station, Watch Towers, Old Power House and other infrastructures at Operational, Non-Operational area including repair to the damages wherever required at Jabalpur Airport

Frist
7. nov. 2026om 3 dage
Køber
Airports Authority of India

Airports Authority of India (Indien) indhenter tilbud i dette udbud. Fristen for tilbud er 7. nov. 2026.

Køber
Airports Authority of India
Land
Indien
Frist
7. nov. 2026om 3 dage
Branche
Byggeri og anlæg
Offentliggjort
15. okt. 2026

Den fulde beskrivelse, dokumenterne, ordregiverens kontaktoplysninger og linket til den officielle portal åbner i den gratis prøveperiode.

Flere udbud: Indien · Udbud byggeri: Indien

Lignende åbne udbud

  1. FIXING SCREW
    Ministry of Railways Frist: 4. nov. 2026
  2. Replacement of Connecting Foot Over Bridge at MP-IDSA, New Delhi
    Defence Research and Development Organisation Frist: 4. nov. 2026
  3. Construction of drainage line around the Composite Hospital Patgaon at Ftr HQ BSF Guwahati
    DG,BSF,Mha Frist: 4. nov. 2026
  4. Const. of RCC drain at Km 228/400 240/500 250/100 and 221/300 Varda leftout of 2 km, Km 250/060 to 250/860 RHS and 1 km miscellaneous length for Banswara overlay section and reconstruction of 1 No. damaged slab culvert NH-927A at Km 260/700
    Ministry of Road Transport and Highways Frist: 4. nov. 2026
  5. Hard shoulders and interlocking tiles work including widening of structures and drains from Kupra Village to Banswara of NH-927A Km 257/00 to 261/00
    Ministry of Road Transport and Highways Frist: 4. nov. 2026
  6. Road safety works including crash barriers interlocking blocks retaining wall roadside drainage junction improvement at Barekhan Fanta and dholapani (Ch. 27/500 and 44/500), and slope stabilization from Ch. 84/0 to 85/0 on NH-56
    Ministry of Road Transport and Highways Frist: 4. nov. 2026
  7. STMC work on NH-56 Old NH-113, Pratapgarh-Padi Section and Construction of 2 Lane Road in Forest Area, Km 38/100-43/040, 46/500-47/080 and 51/640-54/500, NH-113 on EPC Mode, Rajasthan
    Ministry of Road Transport and Highways Frist: 4. nov. 2026
  8. Hard shoulder and interlocking block pavement work from kherwara side pkg4 end point to Do Nadi Pool and Do Nadi Pool to Dungarpur and Tijwad to NH-927A PKG-4 merging point at Km 168/600 to 170/600
    Ministry of Road Transport and Highways Frist: 4. nov. 2026