公共招标 进行中

Construction d'infrastructures scolaires (Relance) (priorisation des matériaux locaux )

英文: Construction of school infrastructure (Recovery) (prioritization of local materials)

查看完整公告和文件:开始免费试用

14 天免费试用。无需银行卡。

采购方
Commune de Grand Popo
国家
贝宁
截止日期
2026年11月9日10 天后
行业
建筑与土木工程
发布时间
2026年10月16日

完整描述、文件、采购方联系方式和官方门户链接在免费试用中开放。

更多招标:贝宁

类似的开放招标

  1. Construction works of three (03) modules of three (03) classrooms without equipment for the benefit of EPP Somè, Zèko quartier B and Kpozoun Lokoli; and construction and equipping of modules of three (03) classrooms + office and store for the benefit of EPP Za-Zounmè and Houanvèli-Tankpa (Za-Tanta)., Construction works of two (02) modules of latrines with four (04) cabins for the benefit of EM de Davègo and the school group of EPP Agongbo A, B and EM
    Commune de Za-Kpota 截止日期: 2026年11月3日
  2. Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
    Commune de Dogbo 截止日期: 2026年11月4日
  3. Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
    Commune d'Agbangninzou 截止日期: 2026年11月5日
  4. Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots
    Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT) 截止日期: 2026年11月5日
  5. Construction works of a palm oil storage center in Adja-Ouèrè.
    Agence Territoriale de Développement Agricole Pôle 6 截止日期: 2026年11月6日
  6. Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
    Commune de Sô Ava 截止日期: 2026年11月6日
  7. Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
    Commune de Pèrèrè 截止日期: 2026年11月9日
  8. Partial construction of the fence of the Sakabansi health center (lot 1); Acquisition of medical equipment for the Nikki health center and the Sounon séro hospital (lot 2).
    Commune de Nikki 截止日期: 2026年11月9日