공공 입찰 마감
Supply Package CIS02 for Bulk Procurement of Composite Long Rod Insulator for Transmission Line Diversion and Consultancy Works-CIS02
이 입찰은 마감되어 더 이상 응찰을 받지 않습니다.
공고 전문과 문서 보기: 무료 체험 시작
14일 무료 체험. 카드가 필요 없습니다.
- 발주기관
- Power Grid Corporation of India Limited
- 국가
- 인도
- 마감일
- 2026. 10. 30.
- 분야
- 전문 및 엔지니어링 서비스
- 공고일
- 2026. 9. 23.
전체 설명, 문서, 발주 기관 연락처, 공식 포털 링크는 무료 체험에서 확인할 수 있습니다.
비슷한 진행 중 입찰
-
Development of New A Site RO - Ideal Service Station resitement at Malur SURVEY NO.40/3, 41/4, 41/5, SAMPANGERE VILLAGE, MALUR TALUK, KOLAR DISTRICT under Bangalore DO of KASO
IndianOil 마감일: 2026. 10. 30.
-
CMRL invites e-tenders under Two Bid from prospective bidders (a registered firm with GST) for Printing and Supply of Diaries and Calendars for the year 2027 in a Customised way.
Chennai Metro Rail Limited 마감일: 2026. 10. 30.
-
E Tender cum E Auction for Selection of Advertisement Agency for allotment of space for Rights to display advertisements at SEEPZ SEZ
Santacruz Electronics Export Processing Zone Special Economic Zone Mumbai 마감일: 2026. 10. 30.
-
Request for Proposal (RFP) for providing Project consultant (PC) for providing Comprehensive Consultancy services from the stage of Feasibility Study & DPR preparation for elimination of Level Crossing gates in NF Railway by constructing ROB and/ RUB/LHS/Other Structures/ Road Diversion as required including Detailed Design of required components of finalised scheme, Tendering for execution of works as per finalized scheme, Techno-Managerial Consultancy, Processing & Facilitation
Ministry of Railways 마감일: 2026. 10. 30.
-
E-Tender engagement of Professional firm for Providing Consultancy Services to Chennai Port Authority on all Direct and Indirect Tax law issues and compliances for a period of two years.
Chennai Port Trust 마감일: 2026. 10. 30.
-
Carrying out Final Location Survey, geotechnical studies, design, preparation of drawings & other preliminary activities for preparing detailed estimate on actual realistic cost in connection with new line between Anupgarh to Bikaner (131.750km) and Spur line from Rojhri to Khajuwala (54.875 km) of Bikaner Division of North Western Railway.
Ministry of Railways 마감일: 2026. 10. 30.
-
Comprehensive Energy & Electrical Safety Audit at Electric Loco Shed, Howrah
Ministry of Railways 마감일: 2026. 10. 30.
-
Monitoring health of ballast bed with the help of ground penetration radar technology for through ballast renewal (TBR) and formation rehabilitation on Indian Railways
Ministry of Railways 마감일: 2026. 10. 30.