Kamu ihalesi Kapandı
Gói thầu số 01 (phi tư vấn): Chỉnh lý tài liệu
İngilizce: Package No. 01 (non-consulting services): Document processing
- Son tarih
- 3 Kas 2026
- Değer
- VND 1.293.759.103
- Alıcı
- Phòng Nội VỤ Xã Bà Điểm
Bu ihale kapandı ve artık teklif kabul etmiyor.
Benzer açık ihaleler · Diğer ihaleler: Vietnam
İlanın tamamını ve belgeleri görün: ücretsiz denemeyi başlatın
14 gün ücretsiz deneme. Kart gerekmez.
- Alıcı
- Phòng Nội VỤ Xã Bà Điểm
- Ülke
- Vietnam
- Son tarih
- 3 Kas 2026
- Değer
- VND 1.293.759.103
- Sektör
- Profesyonel ve mühendislik hizmetleri
- Yayımlandı
- 23 Eki 2026
Tam açıklama, belgeler, alıcının iletişim bilgileri ve resmi portal bağlantısı ücretsiz denemeyle açılır.
Diğer ihaleler: Vietnam · Mühendislik ihaleleri: Vietnam
Benzer açık ihaleler
-
Survey and design consulting services for preparing the economic-technical report, phase 5 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Son tarih: 3 Kas 2026
-
Procurement of control and monitoring modules and electrical industry equipment and materials on ships
Viện Kỹ thuật Hải quân Son tarih: 4 Kas 2026
-
Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Son tarih: 4 Kas 2026
-
Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Son tarih: 4 Kas 2026
-
Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
Liên doanh Việt-Nga Vietsovpetro Son tarih: 4 Kas 2026
-
Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Son tarih: 4 Kas 2026
-
Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Son tarih: 4 Kas 2026
-
Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
Sở Xây dựng tỉnh Phú Thọ Son tarih: 4 Kas 2026