Offentligt udbud Lukket

Gói thầu số 01 (phi tư vấn): Chỉnh lý tài liệu

På engelsk: Package No. 01 (non-consulting services): Document processing

Frist
3. nov. 2026
Værdi
VND 1.293.759.103
Køber
Phòng Nội VỤ Xã Bà Điểm

Dette udbud er lukket og modtager ikke længere tilbud.

Lignende åbne udbud · Flere udbud: Vietnam

Køber
Phòng Nội VỤ Xã Bà Điểm
Land
Vietnam
Frist
3. nov. 2026
Værdi
VND 1.293.759.103
Branche
Professionelle og tekniske tjenester
Offentliggjort
23. okt. 2026

Den fulde beskrivelse, dokumenterne, ordregiverens kontaktoplysninger og linket til den officielle portal åbner i den gratis prøveperiode.

Flere udbud: Vietnam · Udbud ingeniørydelser: Vietnam

Lignende åbne udbud

  1. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân Frist: 4. nov. 2026
  2. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 4. nov. 2026
  3. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 4. nov. 2026
  4. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro Frist: 4. nov. 2026
  5. Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
    Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Frist: 4. nov. 2026
  6. Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
    Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Frist: 4. nov. 2026
  7. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ Frist: 4. nov. 2026
  8. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai Frist: 4. nov. 2026