Offentligt udbud Åbent

Khảo sát, tư vấn thiết kế các dự án: Xây dựng xuất tuyến 22kV đồng bộ với dự án trạm 110kV KCN Trung Thành cấp điện cho khu vực Điện lực Ý Yên, tỉnh Ninh Bình năm 2027; Xây dựng xuất tuyến 22kV đồng bộ với dự án trạm 110kV KCN Trung Thành cấp điện cho khu vực Điện lực Thanh Liêm, tỉnh Ninh Bình năm 2027

På engelsk: Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027

Frist
4. nov. 2026i morgen
Værdi
VND 1.992.120.480
Køber
Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC

Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC (Vietnam) indhenter tilbud i dette udbud. Fristen for tilbud er 4. nov. 2026. Anslået værdi: VND 1.992.120.480. Tilbud afgives elektronisk på den officielle udbudsportal.

Køber
Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC
Land
Vietnam
Frist
4. nov. 2026i morgen
Værdi
VND 1.992.120.480
Branche
Professionelle og tekniske tjenester
Offentliggjort
27. okt. 2026

Den fulde beskrivelse, dokumenterne, ordregiverens kontaktoplysninger og linket til den officielle portal åbner i den gratis prøveperiode.

Flere udbud: Vietnam · Udbud ingeniørydelser: Vietnam

Lignende åbne udbud

  1. Survey and design consulting services for preparing the economic-technical report, phase 5 of 2027
    Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Frist: 3. nov. 2026
  2. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân Frist: 4. nov. 2026
  3. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 4. nov. 2026
  4. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 4. nov. 2026
  5. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro Frist: 4. nov. 2026
  6. Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
    Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Frist: 4. nov. 2026
  7. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ Frist: 4. nov. 2026
  8. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai Frist: 4. nov. 2026