Appel d’offres public Ouvert
Khảo sát, tư vấn thiết kế các dự án: Xây dựng xuất tuyến 22kV đồng bộ với dự án trạm 110kV KCN Trung Thành cấp điện cho khu vực Điện lực Ý Yên, tỉnh Ninh Bình năm 2027; Xây dựng xuất tuyến 22kV đồng bộ với dự án trạm 110kV KCN Trung Thành cấp điện cho khu vực Điện lực Thanh Liêm, tỉnh Ninh Bình năm 2027
En anglais: Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
- Date limite
- 4 nov. 2026demain
- Valeur
- VND 1 992 120 480
- Acheteur
- Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC
14 jours d’essai gratuit. Sans carte.
Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC (Viêt Nam) lance un appel d’offres pour ce marché. Les offres sont à remettre avant le 4 nov. 2026. Valeur estimée : VND 1 992 120 480. Les offres se déposent en ligne sur le portail officiel des marchés publics.
- Acheteur
- Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC
- Pays
- Viêt Nam
- Date limite
- 4 nov. 2026demain
- Valeur
- VND 1 992 120 480
- Secteur
- Services professionnels et d'ingénierie
- Publié
- 27 oct. 2026
La description complète, les documents, les contacts de l’acheteur et le lien vers le portail officiel sont accessibles avec l’essai gratuit.
Plus d’appels d’offres au Viêt Nam · Appels d’offres ingénierie au Viêt Nam
Appels d’offres ouverts similaires
-
Survey and design consulting services for preparing the economic-technical report, phase 5 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Date limite: 3 nov. 2026
-
Procurement of control and monitoring modules and electrical industry equipment and materials on ships
Viện Kỹ thuật Hải quân Date limite: 4 nov. 2026
-
Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Date limite: 4 nov. 2026
-
Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Date limite: 4 nov. 2026
-
Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
Liên doanh Việt-Nga Vietsovpetro Date limite: 4 nov. 2026
-
Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Date limite: 4 nov. 2026
-
Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
Sở Xây dựng tỉnh Phú Thọ Date limite: 4 nov. 2026
-
Consulting services for the preparation of the Pleiku urban master plan
Sở Xây dựng Gia Lai Date limite: 4 nov. 2026