Appel d’offres public Ouvert

Gói 6: Tư vấn giám sát thi công và lắp đặt thiết bị (bao gồm hạng mục trạm biến áp)

En anglais: Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)

Date limite
4 nov. 2026demain
Valeur
VND 2 056 799 674
Acheteur
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam

Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam (Viêt Nam) lance un appel d’offres pour ce marché. Les offres sont à remettre avant le 4 nov. 2026. Valeur estimée : VND 2 056 799 674. Les offres se déposent en ligne sur le portail officiel des marchés publics.

Acheteur
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam
Pays
Viêt Nam
Date limite
4 nov. 2026demain
Valeur
VND 2 056 799 674
Secteur
Services professionnels et d'ingénierie
Publié
28 oct. 2026

La description complète, les documents, les contacts de l’acheteur et le lien vers le portail officiel sont accessibles avec l’essai gratuit.

Plus d’appels d’offres au Viêt Nam · Appels d’offres ingénierie au Viêt Nam

Appels d’offres ouverts similaires

  1. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân Date limite: 4 nov. 2026
  2. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Date limite: 4 nov. 2026
  3. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Date limite: 4 nov. 2026
  4. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro Date limite: 4 nov. 2026
  5. Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
    Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Date limite: 4 nov. 2026
  6. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ Date limite: 4 nov. 2026
  7. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai Date limite: 4 nov. 2026
  8. Package TV01-QLPH: Consulting services for topographic and geological survey; preparation of feasibility study report
    Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau Date limite: 4 nov. 2026