公共入札 受付中

Gói 6: Tư vấn giám sát thi công và lắp đặt thiết bị (bao gồm hạng mục trạm biến áp)

英語: Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)

締切
2026/11/04明日
金額
VND 2,056,799,674
発注者
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam

Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam(ベトナム)がこの入札案件の応札を募集しています。 応札期限は2026/11/04です。 予定価格:VND 2,056,799,674。 応札は公式調達ポータルからオンラインで行います。

発注者
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam
国
ベトナム
締切
2026/11/04明日
金額
VND 2,056,799,674
分野
専門・エンジニアリングサービス
公開日
2026/10/28

詳細な説明、資料、発注機関の連絡先、公式ポータルへのリンクは無料トライアルでご覧いただけます。

その他の入札:ベトナム · ベトナムのエンジニアリング入札

類似の受付中の入札

  1. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân 締切: 2026/11/04
  2. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh 締切: 2026/11/04
  3. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh 締切: 2026/11/04
  4. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro 締切: 2026/11/04
  5. Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
    Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC 締切: 2026/11/04
  6. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ 締切: 2026/11/04
  7. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai 締切: 2026/11/04
  8. Package TV01-QLPH: Consulting services for topographic and geological survey; preparation of feasibility study report
    Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau 締切: 2026/11/04