Appel d’offres public Ouvert

Tư vấn khảo sát, lập BCKTKT và tư vấn xét thầu xây lắp phần không chuyên điện dự án “Di dời, tái bố trí lưới điện ảnh hưởng bởi dự án Nâng cấp, mở rộng Quốc lộ 1 (từ đường Kinh Dương Vương đến ranh tỉnh Long An) - đoạn bên trái tuyến từ đường Nguyễn Văn Linh đến ranh tỉnh Long An)”

En anglais: Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"

Date limite
4 nov. 2026aujourd'hui
Valeur
VND 681 531 880
Acheteur
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh

Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh (Viêt Nam) lance un appel d’offres pour ce marché. Les offres sont à remettre avant le 4 nov. 2026. Valeur estimée : VND 681 531 880. Les offres se déposent en ligne sur le portail officiel des marchés publics.

Acheteur
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh
Pays
Viêt Nam
Date limite
4 nov. 2026aujourd'hui
Valeur
VND 681 531 880
Secteur
Services professionnels et d'ingénierie
Publié
28 oct. 2026

La description complète, les documents, les contacts de l’acheteur et le lien vers le portail officiel sont accessibles avec l’essai gratuit.

Plus d’appels d’offres au Viêt Nam · Appels d’offres ingénierie au Viêt Nam

Appels d’offres ouverts similaires

  1. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân Date limite: 4 nov. 2026
  2. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Date limite: 4 nov. 2026
  3. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro Date limite: 4 nov. 2026
  4. Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
    Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Date limite: 4 nov. 2026
  5. Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
    Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Date limite: 4 nov. 2026
  6. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ Date limite: 4 nov. 2026
  7. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai Date limite: 4 nov. 2026
  8. Package TV01-QLPH: Consulting services for topographic and geological survey; preparation of feasibility study report
    Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau Date limite: 4 nov. 2026