Przetarg publiczny Otwarty
Tư vấn khảo sát, lập BCKTKT và tư vấn xét thầu xây lắp phần không chuyên điện dự án “Di dời, tái bố trí lưới điện ảnh hưởng bởi dự án Nâng cấp, mở rộng Quốc lộ 1 (từ đường Kinh Dương Vương đến ranh tỉnh Long An) - đoạn bên trái tuyến từ đường Nguyễn Văn Linh đến ranh tỉnh Long An)”
Po angielsku: Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
- Termin
- 4 lis 2026dziś
- Wartość
- VND 681 531 880
- Zamawiający
- Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh
14 dni bezpłatnego okresu próbnego. Bez karty.
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh (Wietnam) zaprasza do składania ofert w tym przetargu. Termin składania ofert: 4 lis 2026. Szacunkowa wartość: VND 681 531 880. Oferty składa się elektronicznie na oficjalnej platformie zamówień publicznych.
- Zamawiający
- Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh
- Kraj
- Wietnam
- Termin
- 4 lis 2026dziś
- Wartość
- VND 681 531 880
- Branża
- Usługi profesjonalne i inżynieryjne
- Opublikowano
- 28 paź 2026
Pełny opis, dokumenty, kontakty zamawiającego i link do oficjalnego portalu są dostępne w bezpłatnym okresie próbnym.
Więcej przetargów w Wietnamie · Przetargi inżynieryjne w Wietnamie
Podobne otwarte przetargi
-
Procurement of control and monitoring modules and electrical industry equipment and materials on ships
Viện Kỹ thuật Hải quân Termin: 4 lis 2026
-
Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Termin: 4 lis 2026
-
Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
Liên doanh Việt-Nga Vietsovpetro Termin: 4 lis 2026
-
Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Termin: 4 lis 2026
-
Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Termin: 4 lis 2026
-
Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
Sở Xây dựng tỉnh Phú Thọ Termin: 4 lis 2026
-
Consulting services for the preparation of the Pleiku urban master plan
Sở Xây dựng Gia Lai Termin: 4 lis 2026
-
Package TV01-QLPH: Consulting services for topographic and geological survey; preparation of feasibility study report
Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau Termin: 4 lis 2026