Przetarg publiczny Otwarty

Tư vấn khảo sát, lập BCKTKT và Tư vấn xét thầu xây lắp phần không chuyên điện dự án “Di dời, tái bố trí lưới điện ảnh hưởng bởi dự án Nâng cấp, mở rộng Quốc lộ 1 (từ đường Kinh Dương Vương đến ranh tỉnh Long An) - đoạn bên trái tuyến từ đường Võ Văn Kiệt đến cầu Bình Điền”.

Po angielsku: Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".

Termin
4 lis 2026jutro
Wartość
VND 594 688 094
Zamawiający
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh

Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh (Wietnam) zaprasza do składania ofert w tym przetargu. Termin składania ofert: 4 lis 2026. Szacunkowa wartość: VND 594 688 094. Oferty składa się elektronicznie na oficjalnej platformie zamówień publicznych.

Zamawiający
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh
Kraj
Wietnam
Termin
4 lis 2026jutro
Wartość
VND 594 688 094
Branża
Usługi profesjonalne i inżynieryjne
Opublikowano
28 paź 2026

Pełny opis, dokumenty, kontakty zamawiającego i link do oficjalnego portalu są dostępne w bezpłatnym okresie próbnym.

Więcej przetargów w Wietnamie · Przetargi inżynieryjne w Wietnamie

Podobne otwarte przetargi

  1. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân Termin: 4 lis 2026
  2. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Termin: 4 lis 2026
  3. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro Termin: 4 lis 2026
  4. Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
    Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Termin: 4 lis 2026
  5. Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
    Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Termin: 4 lis 2026
  6. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ Termin: 4 lis 2026
  7. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai Termin: 4 lis 2026
  8. Package TV01-QLPH: Consulting services for topographic and geological survey; preparation of feasibility study report
    Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau Termin: 4 lis 2026