Veřejná zakázka Otevřená

Construction d'une maternité isolée au dispensaire de Tékparou et réhabilitation de la maternité du centre de santé de Koda-Agbassa plus construction d'un bloc de deux latrines et de deux douches

Anglicky: Construction of an isolated maternity unit at the Tékparou dispensary and rehabilitation of the maternity unit of the Koda-Agbassa health centre plus construction of a block of two latrines and two showers

Zadavatel
Commune de Tchaourou
Země
Benin
Lhůta
24. 11. 2026za 25 dní
Obor
Stavebnictví a inženýrské stavby
Zveřejněno
28. 10. 2026

Úplný popis, dokumenty, kontakty zadavatele a odkaz na oficiální portál jsou dostupné ve zkušební verzi zdarma.

Další zakázky: Benin

Podobné otevřené zakázky

  1. Construction works of three (03) modules of three (03) classrooms without equipment for the benefit of EPP Somè, Zèko quartier B and Kpozoun Lokoli; and construction and equipping of modules of three (03) classrooms + office and store for the benefit of EPP Za-Zounmè and Houanvèli-Tankpa (Za-Tanta)., Construction works of two (02) modules of latrines with four (04) cabins for the benefit of EM de Davègo and the school group of EPP Agongbo A, B and EM
    Commune de Za-Kpota Lhůta: 3. 11. 2026
  2. Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
    Commune de Dogbo Lhůta: 4. 11. 2026
  3. Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
    Commune d'Agbangninzou Lhůta: 5. 11. 2026
  4. Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots
    Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT) Lhůta: 5. 11. 2026
  5. Construction works of a palm oil storage center in Adja-Ouèrè.
    Agence Territoriale de Développement Agricole Pôle 6 Lhůta: 6. 11. 2026
  6. Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
    Commune de Sô Ava Lhůta: 6. 11. 2026
  7. Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
    Commune de Pèrèrè Lhůta: 9. 11. 2026
  8. Construction of school infrastructure (Recovery) (prioritization of local materials)
    Commune de Grand Popo Lhůta: 9. 11. 2026