Licitación pública Abierta
Construction d'une maternité isolée au dispensaire de Tékparou et réhabilitation de la maternité du centre de santé de Koda-Agbassa plus construction d'un bloc de deux latrines et de deux douches
En inglés: Construction of an isolated maternity unit at the Tékparou dispensary and rehabilitation of the maternity unit of the Koda-Agbassa health centre plus construction of a block of two latrines and two showers
Ver el anuncio completo y los documentos: empezar la prueba gratuita
Prueba gratis de 14 días. Sin tarjeta.
- Comprador
- Commune de Tchaourou
- País
- Benín
- Plazo
- 24 nov 2026en 24 días
- Sector
- Construcción e ingeniería civil
- Publicado
- 28 oct 2026
La descripción completa, los documentos, los contactos del comprador y el enlace al portal oficial están disponibles con la prueba gratuita.
Licitaciones abiertas similares
-
Construction works of three (03) modules of three (03) classrooms without equipment for the benefit of EPP Somè, Zèko quartier B and Kpozoun Lokoli; and construction and equipping of modules of three (03) classrooms + office and store for the benefit of EPP Za-Zounmè and Houanvèli-Tankpa (Za-Tanta)., Construction works of two (02) modules of latrines with four (04) cabins for the benefit of EM de Davègo and the school group of EPP Agongbo A, B and EM
Commune de Za-Kpota Plazo: 3 nov 2026
-
Development, heavy reprofiling and periodic maintenance works of rural transport infrastructure using the participatory approach with the HIMO method plus opening of urban roads in the two zones of the district of Tota in four (04) lots for the benefit of the commune of Dogbo.
Commune de Dogbo Plazo: 4 nov 2026
-
Track development works: Léproserie-Sohito axis (1.3 km); road (Agbangnizoun-kinta) —Axis (Agbangnizoun Hounto) (1.3 km) and construction of rubble stone ditch on part of the Gbozoun – Kèkèholi track.
Commune d'Agbangninzou Plazo: 5 nov 2026
-
Development and maintenance works on 118,677 km of rural tracks in the departments of Zou, Couffo, Collines, Donga and Alibori divided into three (03) lots
Société des Infrastructures Routières et de l'Aménagement du Territoire (SIRAT) Plazo: 5 nov 2026
-
Construction works of a palm oil storage center in Adja-Ouèrè.
Agence Territoriale de Développement Agricole Pôle 6 Plazo: 6 nov 2026
-
Construction of a module of three classrooms with office-warehouse and equipment at the EPP of SO-ZOUNKO/A on stilts plus a food warehouse at the GANVIE 2 school complex (Lot 4 Relaunch)
Commune de Sô Ava Plazo: 6 nov 2026
-
Routine maintenance works of the track/ITR (Rural Transport Infrastructure) Ourarou - Won - Tchori, 23 km long; of the track/ITR (Rural Transport Infrastructure) Pèrèrè - Kpanè 09 km long; of the track/ITR (Rural Transport Infrastructure) Nassy - Gninsy 07 km long using the HIMO Method
Commune de Pèrèrè Plazo: 9 nov 2026
-
Construction of school infrastructure (Recovery) (prioritization of local materials)
Commune de Grand Popo Plazo: 9 nov 2026