公共招标 进行中
Фағона вилояти Қўқон шахар Бурчлик кўчаси № 2 уйда жойлашган 4 қаватли “Диягностика даволаш соғломлаштириш маркази” биноси қисман бузиш-демантаж қилиш
英文: Partial demolition-dismantling of the 4-storey building of the "Diagnostic Treatment and Health Improvement Center" located at No. 2 Burjlik street, Kokand city, Fergana region
- 截止日期
- 2026年11月6日今天
- 金额
- UZS 566,391,874
- 采购方
- Asakabank
Asakabank(乌兹别克斯坦)正在就本项目招标。 投标截止日期:2026年11月6日。 预估金额:UZS 566,391,874。
- 采购方
- Asakabank
- 国家
- 乌兹别克斯坦
- 截止日期
- 2026年11月6日今天
- 金额
- UZS 566,391,874
- 行业
- 建筑与土木工程
- 发布时间
- 2026年10月30日
完整描述、文件、采购方联系方式和官方门户链接在免费试用中开放。
类似的开放招标
-
Development of the project concept and assessment document for the reconstruction of the 0-65 km section of the D 065 (4P46) "Samarqand sh. - Juma sh. - Kattaqo'rg'on sh." highway
Автойул инвест агентлиги (РЙЖ) 截止日期: 2026年11月6日
-
For the service of constructing a mobile kindergarten street playground and paving the area from the territory of school 19-56 of the Kokdala district preschool and school education department
Кукдала туман халк таълими булими 截止日期: 2026年11月6日
-
Washing of the facade part of buildings
Ўзбекистон Республикаси Президенти Администрацияси Маъмурий биноларга хизмат кўрсатиш бошкармаси 截止日期: 2026年11月6日
-
Muzrabot district Shaffof mfy 816.08 sq m
Давлат активларини бошкариш агентлиги вилоят худудий бошкармаси 截止日期: 2026年11月6日
-
Capital restoration repair of an electric double-girder hook bridge crane with a lifting capacity of 10 tonnes, span 16.5 metres
"Toshkent Issiqlik Markazi" MCHJ 截止日期: 2026年11月6日
-
for the performance of remaining construction and installation works on the object "Construction of the Kugay-1 small hydropower plant on the Great Andijan Canal in the Uchkurgan district of the Namangan region"
Gidroqurilish Buyurtmachi Xizmati MCHJ 截止日期: 2026年11月6日
-
Supply of stone-sand-gravel mixture for the current repair of internal farm roads in Sardoba district of Syrdarya region
Ободонлаштириш бошкармаси 截止日期: 2026年11月6日
-
Major repair and partial replacement of the gas pipeline in the territory of the "Taraqqiyot" mahalla of Qo'shko'pir district of Khorezm region, laying the gas pipeline under the automobile road (protocol)
"Hududgaz Injiniring-Taminot Servis Universal Korxonasi" MCHJ 截止日期: 2026年11月9日