Public tender Closed
Supply of one no Toyota Innova Hycross Hybrid VX O 7 STR- Attitude Black Balmer Lawrie & Co Ltd, at 21 N S Road Kolkata -1
- Deadline
- Nov 6, 2026
- Buyer
- Balmer Lawrie and Co. Ltd.
This tender has closed and no longer takes bids.
Similar open tenders · More tenders in India
See the full notice and documents: start the free trial
14 day free trial. No card needed.
- Buyer
- Balmer Lawrie and Co. Ltd.
- Country
- India
- Deadline
- Nov 6, 2026
- Sector
- Transport & logistics
- Published
- Oct 27, 2026
The full description, the documents, the buyer’s contacts and the link to the official portal open with the free trial.
More tenders in India · Transport tenders in India
Similar open tenders
-
Pneumatic angle grinder etc.
Ministry of Railways Deadline: Nov 6, 2026
-
SET OF RECEPTACLE SIZE 40, 35-POLES AND ITS PIN CONTACTS OF SIZE 12/1.5MM2
Ministry of Railways Deadline: Nov 6, 2026
-
Notching plate for pneumatic brake controller.
Ministry of Railways Deadline: Nov 6, 2026
-
Complete Dome Set Fittings for BTPGLN Wagon as per Drg. No. WCS-7801-S-62, Alt-04 and WCS-7801-S-63, Alt-05 with latest amendments. One set consisting of items (in nos.) as per attached Annexure-A.
Ministry of Railways Deadline: Nov 6, 2026
-
transportation of answer books
Central Board of Secondary Education Deadline: Nov 6, 2026
-
SET OF STRAINERS FOR PNEUMATIC VALVE S COMPRISING OF-- (1) FOR C2 & A9 VALVE, PT.1= 3 NOS. (2) FOR HS4 VALVE, PT.2= 1 NO. (3) FOR A9 & SA9 VALVE, PT.3= 2 NOS. (4) FOR SAFETY VALVE, PT.4= 1 NO. TO CEE S DRG. NO.- LOCO/4/AR/032.
Ministry of Railways Deadline: Nov 6, 2026
-
Set of Nipples required for pneumatic pipelines consisting of two items as follows. 1 1/2
x 1/2 Nipples both sides parallel threads as per Drg. no. B/TRS/ or latest. Qty/set. = 03Nos. 2 3/4 x 1/2 reducing nipple taper & parallel thread(NOM dimension in mm ON OD: 27 x 21R & NOM diameter in mm ON ID: 20.15 as per Drg. No. B/TRS/ Alt A or latest if any. Qty/set. = 01No. Note: Ten sample sets should be got approved before effecting bulk supply.
Ministry of Railways Deadline: Nov 6, 2026
-
Manufacturing ,supplying machine crushed track ballast, stacking at SPTR, NSBG, or anyother suitable yards and loading it into hoppers/wagons/ trucks for various sections/locations under the jurisdiction of Sr. DEN/II/TSK.
Ministry of Railways Deadline: Nov 6, 2026