Öffentliche Ausschreibung Offen

Development work of Roads with construction of Pipe Drain for Khilkhet Uttarpara Ekushe Road(from Ekushe Bhaban to Bhuya Bari) and bye Lanes which H/N. Ka-221/7/B to Ka-210/3/E of Namapara BoatGhat Al-Manar School's North-West side and Noyanogor Adorsho Garage Road which H/N. Ka-144 to Ka-178/4 & Moddopara Talertek Road and from Khilkhet Noyanogor H/N. 145/23/5/1 upto Khapara H/N. Ka-89 under Ward No. 17.

Frist
08.11.2026in 5 Tagen
Auftraggeber
Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Dhaka North City Corporation, Office of the Executive Engineer, Zone-01

Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Dhaka North City Corporation, Office of the Executive Engineer, Zone-01 (Bangladesch) fordert zur Abgabe von Angeboten für diese Ausschreibung auf. Angebotsfrist: 08.11.2026.

Auftraggeber
Ministry of Local Government, Rural Development and Co-operatives, Local Government Division, Dhaka North City Corporation, Office of the Executive Engineer, Zone-01
Land
Bangladesch
Frist
08.11.2026in 5 Tagen
Branche
Bauwesen & Tiefbau
Veröffentlicht
15.10.2026

Die vollständige Beschreibung, die Unterlagen, die Kontakte des Auftraggebers und der Link zum offiziellen Portal stehen im kostenlosen Test offen.

Weitere Ausschreibungen in Bangladesch · Ausschreibungen Bau in Bangladesch

Ähnliche offene Ausschreibungen

  1. Installation work of 80kWp on-grid solar system including design, supply, testing and commissioning on the rooftop of Block C of Sarak Bhaban, Tejgaon, Dhaka through Ferry Construction Division, RHD, Dhaka during the Fiscal Year 2026-27.
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Ferry Construction Division, Dhaka Frist: 03.11.2026
  2. Installation work of 44kWp on-grid solar system including design, supply, testing and commissioning on the rooftop of DTCA Building (RHD Part), Tejgaon, Dhaka through Ferry Construction Division, RHD, Dhaka during the Fiscal Year 2026-27.
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Ferry Construction Division, Dhaka Frist: 03.11.2026
  3. Installation work of 40 KWp on-grid solar system including design, supply, testing and commissioning on the rooftop of Steel Building Sarak Bhaban, Tejgaon, Dhaka through Ferry Construction Division, RHD, Dhaka during the fiscal year 2026-27
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Ferry Construction Division, Dhaka Frist: 03.11.2026
  4. Repairing Damaged portion with with carpeting & seal coat with beam palisiding and Saucer Drain(Differenf Location) at Ch.2+ 738 to Ch.Ch.6+000 Different Location of Madaripur-Kalkini-Bhurghata (Z-8604) Road Under Madaripur Road Division during the year 2026-2027.
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Madaripur Road Division Frist: 03.11.2026
  5. Periodic Maintenance Program for Double Bituminous Surface Treatment (DBST) Work & Intersection Construction at Ch. 34+700 to 36+700, Ch. 44+500 to 49+500, Ch. 55+200 to 61+300 Km & Ch. 75+800 to 82+498 km of Gobindogonj-Ghoraghat- Birampur-Fulbari-Dinajpur (R-585) Road under Road Division Dinajpur During the year 2026-2027
    Ministry of Road Transport and Bridges, Road Transport and Highways Division, Roads & Highways Department (RHD), Dinajpur Road Division Frist: 03.11.2026
  6. Construction of 17 nos. Managed Aquifer Recharge (MAR) in Matikata, Basudebpur, Gogram, Dewpara, Risiqul Union, Godagari Upzila, Rajshahi District.
    Ministry of Finance, Financial Institutions Division, WAVE Foundation, WAVE Foundation-(ECCCP Drought) Frist: 03.11.2026
  7. Re-excavation of 52688 cum Canal with 2 nos earthern DAM in Godagari and Durgapur Upazila in Rajshahi District.
    Ministry of Finance, Financial Institutions Division, WAVE Foundation, WAVE Foundation-(ECCCP Drought) Frist: 03.11.2026
  8. Construction of 17 nos. Managed Aquifer Recharge (MAR) in Matikata and Basudebpur Union, Godagari Upzila, Rajshahi District.
    Ministry of Finance, Financial Institutions Division, WAVE Foundation, WAVE Foundation-(ECCCP Drought) Frist: 03.11.2026