Öffentliche Ausschreibung Offen

Gói thầu TV01-QLPH: Tư vấn khảo sát địa hình, địa chất; lập báo cáo nghiên cứu khả thi

Auf Englisch: Package TV01-QLPH: Consulting services for topographic and geological survey; preparation of feasibility study report

Frist
04.11.2026heute
Wert
VND 7.137.989.000
Auftraggeber
Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau

Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau (Vietnam) fordert zur Abgabe von Angeboten für diese Ausschreibung auf. Angebotsfrist: 04.11.2026. Geschätzter Wert: VND 7.137.989.000. Angebote werden elektronisch über das offizielle Vergabeportal eingereicht.

Auftraggeber
Ban Quản lý dự án công trình Nông nghiệp tỉnh Cà Mau
Land
Vietnam
Frist
04.11.2026heute
Wert
VND 7.137.989.000
Branche
Fach- und Ingenieurdienstleistungen
Veröffentlicht
17.10.2026

Die vollständige Beschreibung, die Unterlagen, die Kontakte des Auftraggebers und der Link zum offiziellen Portal stehen im kostenlosen Test offen.

Weitere Ausschreibungen in Vietnam · Ausschreibungen Ingenieurleistungen in Vietnam

Ähnliche offene Ausschreibungen

  1. Procurement of control and monitoring modules and electrical industry equipment and materials on ships
    Viện Kỹ thuật Hải quân Frist: 04.11.2026
  2. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Nguyen Van Linh Street to the Long An provincial boundary"
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 04.11.2026
  3. Survey consulting, preparation of the economic-technical report and consulting for bid evaluation of construction and installation of the non-specialized electrical portion of the project "Relocation and rearrangement of the power grid affected by the project to Upgrade and Expand National Highway 1 (from Kinh Duong Vuong Street to the Long An provincial boundary) - the left-side section of the route from Vo Van Kiet Street to Binh Dien Bridge".
    Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh Frist: 04.11.2026
  4. Package DV-3955/26-XNDV-TTH Survey and Consulting Services for the Repair of Works and Equipment (Survey and Preparation of Design Dossiers for the Repair of 6 Bulk Material Storage Tanks with a Volume of 1800 CU FT/tank)
    Liên doanh Việt-Nga Vietsovpetro Frist: 04.11.2026
  5. Survey and design consulting services for the projects: Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Yen Yen Power Company area, Ninh Binh Province in 2027; Construction of 22kV outgoing lines in sync with the Trung Thanh Industrial Park 110kV substation project to supply power to the Thanh Liem Power Company area, Ninh Binh Province in 2027
    Công Ty Điện LỰC Ninh Bình – Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC Frist: 04.11.2026
  6. Package 6: Consulting supervision of construction and equipment installation (including the transformer station item)
    Ngân Hàng THƯƠNG Mại CỔ PHẦN Ngoại THƯƠNG Việt Nam Frist: 04.11.2026
  7. Consulting for inspection and detailed assessment of the quality of 09 old apartment buildings in Phu Tho Province.
    Sở Xây dựng tỉnh Phú Thọ Frist: 04.11.2026
  8. Consulting services for the preparation of the Pleiku urban master plan
    Sở Xây dựng Gia Lai Frist: 04.11.2026