公共招标 进行中
Tư vấn khảo sát, lập TKBVTC-dự toán và lập mô hình thông tin công trình (BIM)
英文: Consulting services for survey, preparation of construction drawing design and cost estimate, and building information modeling (BIM)
- 截止日期
- 2026年11月4日今天
- 金额
- VND 11,694,308,854
- 采购方
- Ban QLDA Đầu tư Xây dựng xã Thanh An
Ban QLDA Đầu tư Xây dựng xã Thanh An(越南)正在就本项目招标。 投标截止日期:2026年11月4日。 预估金额:VND 11,694,308,854。 投标须通过官方采购平台在线提交。
- 采购方
- Ban QLDA Đầu tư Xây dựng xã Thanh An
- 国家
- 越南
- 截止日期
- 2026年11月4日今天
- 金额
- VND 11,694,308,854
- 行业
- 专业与工程服务
- 发布时间
- 2026年10月17日
完整描述、文件、采购方联系方式和官方门户链接在免费试用中开放。
类似的开放招标
-
Provision of consulting services for audit of final accounts of completed major repair works - S1 Turbine Unit Overhaul Project - Vinh Tan 2 Thermal Power Plant in 2026
Công Ty Nhiệt Điện VĨNH Tân - Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN 截止日期: 2026年11月4日
-
Provision of Concept Study services for Gau Chua Field Development, Block 10&11-1, package No. PVEPNCS-GC- 2026-001
Chi Nhánh THĂM Dò Khai Thác Dầu Khí Nam Côn SƠN- Công Ty Trách Nhiệm Hữu HẠN- TỔNG Công Ty THĂM Dò Khai Thác Dầu Khí 截止日期: 2026年11月4日
-
Global Programme Newsletter, Productivity Ecosystems for Decent Work
ILO 截止日期: 2026年11月4日
-
Installation of remote monitoring for SA500 equipment and Outer Marker at K2 navigation station
CẢNG Hàng Không Quốc TẾ Nội Bài - Chi Nhánh TỔNG Công Ty CẢNG Hàng Không Việt Nam - CTCP 截止日期: 2026年11月4日
-
TV02-NTB1.1&1.2: Consulting services for appraisal of the Pre-Feasibility Study Report of the Nam Trung Bo Offshore Wind Power Project 1.1 and the Nam Trung Bo Offshore Wind Power Project 1.2
TẬP Đoàn Công Nghiệp - NĂNG LƯỢNG Quốc Gia Việt Nam 截止日期: 2026年11月4日
-
Consulting services for survey, preparation of economic-technical report and consulting services for bid evaluation of construction and installation of the non-electrical portion of the project "Relocation and rearrangement of the power grid affected by the project Upgrading and Expanding National Highway 1 (from Kinh Duong Vuong road to the Long An provincial boundary) - the right-hand section of the route from An Lac roundabout to Nguyen Van Linh road"
Chi Nhánh TỔNG Công Ty Điện LỰC Thành PHỐ HỒ Chí Minh TNHH - Công Ty Điện LỰC Bình Chánh 截止日期: 2026年11月4日
-
Survey, assessment and preparation of design documents for treating longitudinal cracks on the main dam surface - Srepok 3 Hydropower Project
Công Ty Thủy Điện Buôn Kuốp- Chi Nhánh TỔNG Công Ty Phát Điện 3 - Công Ty CỔ PHẦN 截止日期: 2026年11月4日
-
Consulting services for Construction Supervision of the construction project, phase 4 of 2027
Công Ty Điện LỰC NGHỆ An - Chi Nhánh TỔNG Công Ty Điện LỰC Miền BẮC 截止日期: 2026年11月4日