Öffentliche Ausschreibung Abgelaufen

Gói thầu số 01: Cung cấp và thi công lắp đặt thảm trải sàn tầng 2,3,19 của Nhà khách Quốc hội tại Đà Nẵng

Auf Englisch: Package No. 01: Supply and installation of floor coverings for floors 2, 3, 19 of the National Assembly Guesthouse in Da Nang

Frist
04.11.2026
Wert
VND 3.121.811.000
Auftraggeber
Nhà khách Quốc hội tại Đà Nẵng

Diese Ausschreibung ist abgelaufen und nimmt keine Angebote mehr an.

Ähnliche offene Ausschreibungen · Weitere Ausschreibungen in Vietnam

Auftraggeber
Nhà khách Quốc hội tại Đà Nẵng
Land
Vietnam
Frist
04.11.2026
Wert
VND 3.121.811.000
Branche
Bauwesen & Tiefbau
Veröffentlicht
26.10.2026

Die vollständige Beschreibung, die Unterlagen, die Kontakte des Auftraggebers und der Link zum offiziellen Portal stehen im kostenlosen Test offen.

Weitere Ausschreibungen in Vietnam · Ausschreibungen Bau in Vietnam

Ähnliche offene Ausschreibungen

  1. Package 01: Dredging of sludge from the intake chambers of pumping stations and the system of underground sewers and canals
    SỞ Xây DỰNG Thành PHỐ Hải Phòng Frist: 04.11.2026
  2. Construction, procurement and installation of project equipment
    TRƯỜNG Đại HỌC THỂ DỤC THỂ Thao TP. HỒ Chí Minh Frist: 04.11.2026
  3. Package No. 01: Replacement of underground cables, lighting poles, brackets, luminaires and burnt-out electrical cabinets
    SỞ Xây DỰNG Thành PHỐ Hải Phòng Frist: 04.11.2026
  4. Construction and installation + equipment
    Phòng Kinh tế xã Phú Xuân Frist: 05.11.2026
  5. Construction and ensuring traffic safety for the project of Renovation of road, sidewalk and drainage on Ly Bon street (from the intersection with Quang Trung street to the intersection with Phan Ba Vanh street)
    UBND phường Trần Hưng Đạo Frist: 05.11.2026
  6. Construction of the works
    Công Ty TNHH MTV Petrolimex LẠNG SƠN Frist: 05.11.2026
  7. Package No. 03: Construction
    Phòng kinh tế xã Sốp Cộp Frist: 05.11.2026
  8. Construction and installation package: Traffic infrastructure, drainage for Go Thuyen A residential area - Phase II
    Ban Quản lý dự án xã Tân Hưng Frist: 05.11.2026