Openbare aanbesteding Open
Gói thầu số 5: Xây lắp toàn bộ công trình (Bao gồm chi phí nhà tạm để ở và điều hành thi công hạng mục xây dựng).
In het Engels: Package No. 5: Construction and installation of the entire works (Including costs of temporary housing for accommodation and construction management of the construction items).
- Sluitingsdatum
- 5 nov 2026morgen
- Waarde
- VND 13.844.437.810
- Aanbestedende dienst
- Trung Tâm DỊCH VỤ TỔNG HỢP Xã HỒNG Thái
14 dagen gratis proberen. Geen kaart nodig.
Trung Tâm DỊCH VỤ TỔNG HỢP Xã HỒNG Thái (Vietnam) vraagt inschrijvingen voor deze aanbesteding. Inschrijven kan tot 5 nov 2026. Geraamde waarde: VND 13.844.437.810. Inschrijvingen gaan online via het officiële aanbestedingsplatform.
- Aanbestedende dienst
- Trung Tâm DỊCH VỤ TỔNG HỢP Xã HỒNG Thái
- Land
- Vietnam
- Sluitingsdatum
- 5 nov 2026morgen
- Waarde
- VND 13.844.437.810
- Sector
- Bouw en civiele techniek
- Gepubliceerd
- 27 okt 2026
De volledige beschrijving, de documenten, de contactgegevens van de aanbestedende dienst en de link naar het officiële portaal zijn beschikbaar in de gratis proefperiode.
Meer aanbestedingen in Vietnam · Aanbestedingen bouw in Vietnam
Vergelijkbare open aanbestedingen
-
Package No. 01: Replacement of underground cables, lighting poles, brackets, luminaires and burnt-out electrical cabinets
SỞ Xây DỰNG Thành PHỐ Hải Phòng Sluitingsdatum: 4 nov 2026
-
Construction and installation + equipment
Phòng Kinh tế xã Phú Xuân Sluitingsdatum: 5 nov 2026
-
Construction and ensuring traffic safety for the project of Renovation of road, sidewalk and drainage on Ly Bon street (from the intersection with Quang Trung street to the intersection with Phan Ba Vanh street)
UBND phường Trần Hưng Đạo Sluitingsdatum: 5 nov 2026
-
Construction of the works
Công Ty TNHH MTV Petrolimex LẠNG SƠN Sluitingsdatum: 5 nov 2026
-
Package No. 03: Construction
Phòng kinh tế xã Sốp Cộp Sluitingsdatum: 5 nov 2026
-
Construction and installation package: Traffic infrastructure, drainage for Go Thuyen A residential area - Phase II
Ban Quản lý dự án xã Tân Hưng Sluitingsdatum: 5 nov 2026
-
Package No. 03: Construction of the works
Ban quản lý dự án đầu tư xây dựng khu vực Đam Rông Sluitingsdatum: 5 nov 2026
-
Upgrading and expanding Cua Ga road
Ban Quản lý dự án xã An Trạch Sluitingsdatum: 5 nov 2026